(A19_093_2016_0930076_1075) HOTEL SIZI — FIXTURES (Q2066500)

From EU Knowledge Graph
Revision as of 00:29, 9 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
(A19_093_2016_0930076_1075) HOTEL SIZI — FIXTURES
Project in Italy financed by DG Regio

    Statements

    0 references
    12,744.0 Euro
    0 references
    25,488.0 Euro
    0 references
    50.0 percent
    0 references
    2 September 2016
    0 references
    12 April 2019
    0 references
    2 September 2018
    0 references
    ALBERGO RISTORANTE BAR SICHI DI BETTINI ALMA, CECCARELLLI CARLUC CIO E C. SNC
    0 references
    0 references
    0 references
    L'INTERVENTO PREVISTO CONSISTE NELLA MERA SOSTITUZIONE DEGLI INFISSI ESISTENTI IN LEGNO DI ABETE E VETRO SINGOLO CON INFISSI IN PVC E VETRO CAMERA. (Italian)
    0 references
    THE INTENDED INTERVENTION CONSISTS OF THE MERE REPLACEMENT OF THE EXISTING FRAMES OF SPRUCE AND SINGLE GLASS WITH PVC AND GLASS FRAMES. (English)
    0 references

    Identifiers