ENERGY EFFICIENCY IN PRODUCTION STRUCTURE 2018 (Q2074841)
Jump to navigation
Jump to search
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | ENERGY EFFICIENCY IN PRODUCTION STRUCTURE 2018 |
Project in Italy financed by DG Regio |
Statements
44,436.68 Euro
0 references
88,873.37 Euro
0 references
50.0 percent
0 references
8 June 2018
0 references
11 July 2019
0 references
14 December 2018
0 references
MASCHIETTO MARIO EREDI S.R.L.
0 references
INTERVENTI FINALIZZATI ALLA RIDUZIONE DEI CONSUMI ENERGETICI E DELLE EMISSIONI DI GAS CLIMALTERANTI DELL'IMPRESA CON PRIORITA' ALLE TECNOLOGIE AD ALTA EFFICIENZA COMPRENDENTE: - INSTALLAZIONE DI SISTEMA COGENERATORE DI 100 KW ELETTRICI; - SOSTITUZIONE DELLE LAMPADE ESISTENTI CON LAMPADE EQUIVALENTI A LED; - INSTALLAZIONE DI SISTEMA DI MONITORAGGIO CONSUMI E PRODUZIONE PUNTUALE; - INSTALLAZIONE DI NR. 2 ECONOMIZZATORI DI RETE; - INSTALLAZIONE DI IMPIANTO SOLARE FOTOVOLTAICO; - INSTALLAZIONE DI SISTEMA DI RIFASAMENTO. (Italian)
0 references
MEASURES TO REDUCE ENERGY CONSUMPTION AND EMISSIONS OF CLIMATE-CHANGING GASES INTO HIGH-EFFICIENCY TECHNOLOGIES INCLUDING: — CHP SYSTEM INSTALLATION OF 100 KW; REPLACING EXISTING LAMPS WITH EQUIVALENT LED LAMPS; — INSTALLATION OF DETAILED CONSUMPTION AND PRODUCTION MONITORING SYSTEM; — INSTALLATION OF 2 ECONOMISERS; INSTALLATION OF SOLAR PHOTOVOLTAIC SYSTEM; — RECASTING SYSTEM INSTALLATION. (English)
0 references
Identifiers
B37B18000110009
0 references