6,621,516.93 Euro
0 references
8,828,689.24 Euro
0 references
75.0 percent
0 references
30 November 2013
0 references
7 February 2019
0 references
COMUNE DI MONTE DI PROCIDA
0 references
GLI INTERVENTI, PREVISTI NEL PROGETTO A BASE DI GARA, RIGUARDANO ESSENZIALMENTE INTERVENTI DI CHIODATURA CON RETI E BARRE DI ANCORAGGIO, VOLTI A METTERE IN SICUREZZA I COSTONI MEDIANTE STABILIZZAZIONE DEI FRONTI ROCCIOSI PROTEGGENDOLI DAGLI AGENTI ATMOSFERICI. GLI INTERVENTI MIGLIORATIVI PROPOSTI IN FASE DI GARA POSSONO RITENERSI COMPLEMENTARI A QUELLI PREVISTI IN PROGETTO PERFEZIONANDO IL QUADRO DEGLI INTERVENTI POSSIBILI IN RIFERIMENTO ALLE DIVERSE DINAMICHE DI INNESCO. LA FILOSOFIA DI INTERVENTO PERSEGUITA, CONTEMPLA: 1. LA CORRETTA REGIMENTAZIONE DELLE ACQUE METEORICHE A MONTE DEI COSTONI (SIA IN AREA URBANIZZATA CHE LIBERA DA EDIFICAZIONI), 2. DRENAGGI SUB SUPERFICIALI PER L'INTERCETTAZIONE DEL FLUSSO PARALLELO AL VERSANTE, 3. RAFFORZAMENTO CORTICALE DEI TERRENI DI COPERTURA, 4. MIGLIORAMENTI QUALITATIVI DEI SISTEMI DI ANCORAGGIO E DELLE RETI DI PROGETTO, PROTEZIONE AL PIEDE DELLE SCARPATE MEDIANTE LA REALIZZAZIONE DI TERRE RINFORZATE. (Italian)
0 references
THE INTERVENTIONS, AS PLANNED IN THE PROJECT BASED ON THE TENDER, MAINLY CONCERN BRAIDING WITH ANCHOR BARS AND RODS, AIMED AT SECURING THE RIBS THROUGH STABILISATION OF ROCKY FRONTS BY PROTECTING THEM AGAINST ATMOSPHERIC AGENTS. THE IMPROVEMENT MEASURES PROPOSED AT THE STAGE OF THE TENDER CAN BE CONSIDERED COMPLEMENTARY TO THOSE ENVISAGED IN THE PROJECT BY IMPROVING THE FRAMEWORK OF POSSIBLE INTERVENTIONS BY REFERENCE TO THE DIFFERENT STARTING POINTS. THE COURSE OF ACTION PURSUED INCLUDES: 1 THE CORRECT MANAGEMENT OF THE RAINWATER UPSTREAM OF THE RIBS (IN BOTH THE URBANISED AREA AND FREE OF CONSTRUCTION), 2. SUBSURFACE DRAINAGE FOR THE INTERCEPTION OF PARALLEL FLOW, 3. CORTICAL INCREASE OF COVER PLOTS, 4. QUALITY IMPROVEMENTS OF ANCHORING SYSTEMS AND DESIGN NETWORKS, PROTECTING THE FOOT OF THE SLOPES THROUGH THE REALISATION OF REINFORCED LAND. (English)