The development and ordering of empty publ spaces through the construction of a sports square.-rekreac. at SP No 1 in Ornet, together with the adaptation of the premises SP No. 1 to increase sports and artistic activity of people at risk of exclusion of the community. (Q132727)
Jump to navigation
Jump to search
Project Q132727 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | The development and ordering of empty publ spaces through the construction of a sports square.-rekreac. at SP No 1 in Ornet, together with the adaptation of the premises SP No. 1 to increase sports and artistic activity of people at risk of exclusion of the community. |
Project Q132727 in Poland |
Statements
1,799,891.92 zloty
0 references
2,358,348.96 zloty
0 references
76.32 percent
0 references
1 April 2020
0 references
30 October 2021
0 references
GMINA ORNETA
0 references
Zakres projektu obejmuje: - Zagosp.terenów zielonych przy Szkole.Powstanie park dzielący się na dwie strefy:1.to rekreacyjno-sportowa z ogrodzonym boiskiem wielofunkc.,bieżnią do skoku w dal,bieżnią, siłownią zewn.,skocznią torem rolkowym o naw.betonowej oraz skateparkiem do jazdy ewolucyjnej na deskorolkach,łyżworolkach oraz rowerach. 2.strefa wypoczynkowa,w której projektuje się zestaw ławek ze stołem,zestaw ławek ze stołem do gry w szachy/chińczyka oraz plac zabaw wyposażony w różne sprzęty i urządzenia do zabawy dla najmłodszych. Ciągi pieszo-rowerowe i ścieżki piesze planuje się wykonać o naw.mineralnej,natomiast tor rolkowy o naw.betonowej.Oświetlenie ciągów kom. projektowane jest w postaci lamp parkowych w technologii LED oraz lampy z panelem fotowoltaicznym.Projektuje się również wykonanie instalacji monitoringu zewnętrznego.Wysoki standard rozwiązań i bogata nowa infrastruktura parku,stworzy miejsce rekreacji i wypoczynku adresowanego m.in.do mieszkańców Ornety, w tym zam. tereny wymagające rewit.. - adaptację pomieszczeń w istniejącym budynku Szkoły przy ul. Zamkowej 26. Działanie to polega na: wymianie stolarki okiennej i drzwiowej, remoncie ścian i podłóg, utworzeniu sanitariatów w piwnicy, wydzieleniu nowych pomieszczeń ścianami ścianami działowymi, remoncie inst.elektr, remoncie inst. c.o. i wod-kan, wykonaniu inst.wentylacji mechanicznej i dostosowanie wentylacji do obowiązujących norm, montażu elektrycznego krzesełka schodowego, wyposażaniu w niezbędne sprzęty (dotyczy tylko pomieszczeń wc). Działania planowane w ramach projektu zgodnie z zapisami SZOP mają służyć rewitalizacji przestrzeni publicznej. Możliwa tam będzie organizacja spotkań i zajęć dla osób zagrożonych wykluczeniem społecznym, dzięki czemu wzmocnione zostanie poczucie przynależności tych osób do ogółu społeczeństwa. Realizacja projektu stworzy warunki do integracji grup wykluczonych lub zagrożonych wykluczeniem społecznym. (Polish)
0 references
The scope of the project includes: The park is divided into two zones: 1.It is a recreational and sporting field with a fenced multifunctional field, a long-distance jump, a track, an outdoor gym, a roller track with a concrete roller track and a skatepark for skating on skateboards, roller skateboards and bicycles. 2.The seating area, which designs a set of benches with a table, a set of benches with a table for playing chess/Chinese, and a playground equipped with various equipment and facilities for playing games for the youngest. On foot-bicycles and footpaths are planned to be carried out with a mineral wall, while a roller track with a concrete surface is planned.Illustration of com. strings is designed in the form of park lamps in LED technology and lamps with photovoltaic panel.The project is also designed to make an external monitoring installation. High standard of solutions and rich new infrastructure of the park will create a place of recreation and recreation addressed, among others. — adaptation of rooms in the existing school building at ul. Locker 26. This action consists of: replacement of window and door carpentry, renovation of walls and floors, creation of sanitary facilities in the basement, separation of new rooms with partition walls, repair of inst.elektr, repair inst. c.o. and water-channel, manufacture of mechanical ventilation and adaptation of ventilation to the applicable standards, installation of an electric stairchair, fitting the necessary equipment (only for wc rooms). The activities planned under the project in accordance with the provisions of the SZOP are intended to revitalise the public space. It will be possible to organise meetings and activities for those at risk of social exclusion, thereby enhancing their sense of belonging to the general public. The implementation of the project will create the conditions for the integration of groups excluded or at risk of social exclusion. (English)
21 October 2020
0 references
Identifiers
RPWM.08.01.00-28-0007/19
0 references