Thermal modernisation of public buildings in Wodzisław commune (Q127650)

From EU Knowledge Graph
Revision as of 17:29, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q127650 in Poland
Language Label Description Also known as
English
Thermal modernisation of public buildings in Wodzisław commune
Project Q127650 in Poland

    Statements

    0 references
    1,185,299.04 zloty
    0 references
    284,471.77 Euro
    13 January 2020
    0 references
    1,836,249.48 zloty
    0 references
    440,699.88 Euro
    13 January 2020
    0 references
    64.55 percent
    0 references
    24 October 2016
    0 references
    31 October 2018
    0 references
    GMINA WODZISŁAW
    0 references
    Przedmiotem proj. jest termomodernizacja budynków użyteczności publ. na terenie gminy Wodzisław woj. świętokrzyskie. Budynkami tymi są stanowiące wł. Gminy Wodzisław budynki szkół podstawowych w: Niegosławicach, Mierzawie, Lubczy i Brześciu pełniące ważne społecznie funkcje eduk-oświatowe i kulturalne. Proj. realizuje Gmina Wodzisław w okresie X2016-IX2018 zgodnie z Harmonogramem ponoszenia wydatków. Wartość proj. wyn. 1911186,31 zł, w tym wart.: k. kwalifikowalnych 1594875,53zł, dofinansowanie 74,33% - 1185470,98 zł, wkład wł. Gminy – 725715,33 zł. Zakres proj. wynika z audytów energet. opracowanych w XI2016 oraz jest zgodny z zapisami Planu Gospodarki Niskoemisyjnej dla GW –str.112-133. Wpisuje się on także w pozostałe przedsięwzięcia rewitalizacyjne ujęte w Lokalnym programie rewitalizacji GW –str. 51-54. Realizacja proj. wpisuje się w cele szczegółowe wyznaczone dla Osi priorytetowej 3 Efektywna i zielona energia oraz dla Działania 3.3 poprzez poprawę efektywności energet.4 budynków użyt. publ. o łącznej pow. użytkowej 4312,91m2 o 50,45% (w poszcz. budynkach: 35,37%, 68,27%, 76,32%, 40,80%). Realizacja zadania, tj. ocieplenie ścian zewn. i stropodachów, wymiana okien i drzwi zewn., wymiana grzejników i zaworów termostatycznych oraz przebudowa instalacji c.o. zwiększy izolację tych budynków co zmniejszy straty ciepła, zmniejszy zużycie energii końcowej o 3390,05 GJ/rok i tym samym zapotrzebowanie na energię. Wpłynie to na zmniejszenie emisji zanieczyszczeń do atmosfery i tym samym poprawę środowiska naturalnego. W ramach proj. nie będą wymieniane indywidualne źródła ciepła oraz nie będą modernizowane lub instalowane urządzenia do produkcji energii zasilanej węglem. Nastąpi wymiana zaworów termostatycznych wraz z montażem indywidualnych liczników ciepła. Gmina zobowiązuje się przeprowadzić audyt energet. ex-post w okresie 14 m-cy od zakończenia projektu. (Polish)
    0 references
    The subject of the project is the thermal modernisation of buildings of utility publ. in the municipality of Wodzisław woj. Świętokrzyskie. These buildings are made up of Own. Communes of Wodzisław primary school buildings in: Niesławiceach, Mierzawie, Lubczy i Brześciu performs socially important educational and cultural functions. The project implements Wodzisław Municipality in the period X2016-IX2018 according to the schedule of incurring expenditure. The value of the project. 1911186,31 zlotys, including worth.: eligible PLN 1594875.53, co-financing 74.33 % – PLN 1185470.98, share contribution. Communes – 725715,33 zlotys. The scope of the project results from energy audits developed in XI2016 and is consistent with the provisions of the Low Emission Economy Plan for GW – pp. 112-133. It is also part of the other revitalisation projects included in the local revitalisation programme GW-str. 51-54. Implementation of the project is in line with the specific objectives set for Priority Axis 3 Efficiency and Green Energy and Measure 3.3 by improving the efficiency of energet.4 buildings using publ. with a total usable area of 4312.91 m² by 50.45 % (in buildings: 35.37 %, 68.27 %, 76.32 %, 40.80 %). Implementation of the task, i.e. insulation of external walls and stropodache, replacement of windows and external doors, replacement of radiators and thermostatic valves and reconstruction of central heating installations will increase insulation of these buildings which will reduce heat losses, reduce final energy consumption by 3390.05 GJ/year and thus require energy. This will reduce emissions of pollutants into the atmosphere and thus improve the environment. The project will not replace individual heat sources and will not be modernised or installed equipment for the production of coal-powered energy. Thermostatic valves will be replaced with the installation of individual heat meters. The municipality undertakes to carry out an ex-post audit within 14 months of the completion of the project. (English)
    21 October 2020
    0 references