Reduction of low emissions from the housing sector in Grybów commune by co-financing the exchange of low-efficiency heat sources with solid fuels for modern heating equipment_2 (Q112427)

From EU Knowledge Graph
Revision as of 12:45, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q112427 in Poland
Language Label Description Also known as
English
Reduction of low emissions from the housing sector in Grybów commune by co-financing the exchange of low-efficiency heat sources with solid fuels for modern heating equipment_2
Project Q112427 in Poland

    Statements

    0 references
    1,383,767.24 zloty
    0 references
    332,104.14 Euro
    13 January 2020
    0 references
    1,404,817.0 zloty
    0 references
    337,156.08 Euro
    13 January 2020
    0 references
    98.5 percent
    0 references
    1 February 2017
    0 references
    31 July 2020
    0 references
    GMINA GRYBÓW
    0 references
    0 references
    Przedmiotowy projekt zakłada wymianę 150 nieefektywnych źródeł ciepła opartych o paliwa stałe, na nowoczesne urządzenia grzewcze wraz z armaturą i osprzętem oraz przystosowaniem instalacji wew. c.o i c.w.u w budynkach mieszkalnych na terenie Gminy Grybów. Zakres prac modernizacyjnych wynikał będzie z oceny energetycznej każdego budynku. W ramach projektu nie planuje się podłączania budynków mieszkalnych do lokalnej sieci ciepłowniczej, stąd projekt dotyczy wyłącznie wymiany starych źródeł ciepła na nowe instalacje kotły paliwa stałe 145 szt. i pompy ciepła 5 szt.Zakres rzeczowy przedmiotowego projektu: ZADANIE 1 Dokumentacja projektowa Działanie 1.1. Opracowanie analizy finansowej i ekonomicznej projektu Działanie 1.2. Opracowanie analizy finansowej i ekonomicznej projektu ZADANIE 2 Wymiana nieekologicznych źródeł ciepła Działanie 2.1. Wymiana kotłów Działanie 2.2. Prace przystosowawcze instalacji wewnętrznych ZADANIE 3 Działania podnoszące świadomość ekologiczną społeczeństwa Działanie 3.1. Organizacja szkoleńwarsztatówspotkań ZADANIE 4 Koszty pośrednie Działanie 4.1. Koszty informacji i promocji, zarządzania projektem oraz kontroli modernizacji i eksploatacji systemów grzewczychWskaźniki rezultatu projektu:Szacowany roczny spadek emisji gazów cieplarnianych: 424,921 Mg CO2rok 34,42Poziom emisji pyłu PM10: bazowy 4,511 Mgrok, docelowy 0,170 Mgrok redukcja 96,22 Poziom emisji pyłu PM2,5: bazowy 1,899 Mgrok, docelowy 0,162 Mgrok redukcja 91,47W ramach projektu planuje się dodatkowo system kontroli modernizacji i eksploatacji systemów grzewczych oraz realizację działań na rzecz podnoszenia świadomości ekologicznej społeczeństwa w formie szkoleńwarsztatówspotkań z zakresu racjonalnej gospodarki energetycznej, skierowanych do szerokiego grona odbiorców z terenu gminy. Konieczność realizacji przedmiotowego projektu wynika ponadto z zapisów POP dla wojew. małopolskiego oraz PGN Gminy Grybów (Polish)
    0 references
    This project involves the replacement of 150 inefficient sources of heat based on solid fuels, for modern heating appliances with fittings and fittings and adaptation of the installation of the above-mentioned central and central heating systems in residential buildings in the Grybów commune. The scope of modernisation works will result from the energy assessment of each building. The project does not plan to connect residential buildings to the local heating network, hence the project only concerns the replacement of old heat sources for new installations of solid fuel boilers 145 pcs and heat pumps 5 units. Task 1 Project documentation Action 1.1. Development of financial and economic analysis of the project Action 1.2. Preparation of financial and economic analysis of the project ATTENTION 2 Exchange of non-organic heat sources Measure 2.1. Replacement of boilers Action 2.2. Adaptation work of internal installations ATTENTION 3 Actions raising the environmental awareness of the public Action 3.1. Organisation of training workshops for meetings ATTENTION 4 Indirect costs Measure 4.1. Costs of information and promotion, project management and control of modernisation and operation of heating systemsIndicators of the project result: Estimated annual reduction in greenhouse gas emissions: 424,921 Mg CO2year 34,42 PM10 emission level: base 4,511 Mgrok, target 0,170 Mgrok reduction 96,22 PM2,5 dust emission level: base 1.899 Mgrok, target 0.162 Mgrok reduction 91.47 The project additionally plans to control modernisation and operation of heating systems and implement actions aimed at raising the public’s environmental awareness in the form of training workshops for meetings in the field of rational energy management, aimed at a wide range of customers from the municipality. The necessity of implementing this project also stems from the provisions of the POP for the province of Małopolskie and PGN of Grybów commune (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.04.04.03-12-0131/17
    0 references