CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT IN THE MUNICIPALITY OF SŁAWNO (Q102008)

From EU Knowledge Graph
Revision as of 10:41, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q102008 in Poland
Language Label Description Also known as
English
CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT IN THE MUNICIPALITY OF SŁAWNO
Project Q102008 in Poland

    Statements

    0 references
    383,214.94 zloty
    0 references
    91,971.59 Euro
    13 January 2020
    0 references
    451,372.13 zloty
    0 references
    108,329.31 Euro
    13 January 2020
    0 references
    84.9 percent
    0 references
    1 March 2017
    0 references
    30 November 2017
    0 references
    GMINA SŁAWNO
    0 references
    0 references

    51°23'31.2"N, 20°8'23.6"E
    0 references
    PROJEKT POLEGA NA BUDOWIE OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH NA ODCINKACH: • SZADKOWICE – ANTONIÓWKA: 17 PUNKTÓW ŚWIETLNYCH Z OPRAWAMI TYPU LED I 2 ZNAKI AKTYWNE ZASILANE Z MODUŁU FOTOWOLTAICZNEGO • BRATKÓW-KAMIEŃ: 29 PUNKTY ŚWIETLNE Z OPRAWAMI TYPU LED • PRYMUSOWA WOLA: 33 PUNKTY ŚWIETLNE Z OPRAWAMI TYPU LED ŁĄCZNIE WYBUDOWANE ZOSTANĄ 79 PUNKTY ŚWIETLNE Z OPRAWAMI TYPU LED ORAZ 2 ZNAKI AKTYWNE ZASILANE Z MODUŁU FOTOWOLTAICZNEGO (OZE) PLANOWANA INWESTYCJA JEST ELEMENTEM SZERSZEGO PROJEKTU INFRASTRUKTURALNEGO, RÓWNOLEGLE REALIZOWANEGO I FINANSOWANEGO PRZEZ BENEFICJENTA – WIĘCEJ W PKT. 6.6 WOD. OBECNE WYSOKIE KOSZTY OŚWIETLANIA MIEJSC UŻYTECZNOŚCI PUBLICZNEJ: • GENERUJĄ WYSOKIE KOSZTY OŚWIETLANIA • ZWIĘKSZAJĄ ZANIECZYSZCZANIE ŚRODOWISKA • WYSOKIE KOSZTY OŚWIETLANIA POWODUJĄ, IŻ NIE WZRASTA PROPORCJONALNIE DO POTRZEB LICZBA NOWYCH INWESTYCJI • ZWIĄZANE SĄ Z NIEWYKORZYSTANIEM SYSTEMÓW ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH (OZE). NIEZBĘDNE DZIAŁANIA JAKIE NALEŻY WDROŻYĆ TO: ZADANIA: 1. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH W MIEJSCOWOŚCIACH SZADKOWICE I ANTONIÓWKA. 2. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH W MIEJSCOWOŚCIACH BRATKÓW I KAMIEŃ. 3. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH W MIEJSCOWOŚCI PRYMUSOWA WOLA. 4. PROMOCJA PROJEKTU. 5. NADZÓR INWESTORSKI. SZCZEGÓŁOWE WYMAGANIA TECHNICZ. ZNAJDUJĄ SIĘ W SW ROZ. 4 ORAZ W ZAŁ. 3. CELE: DZIĘKI REALIZACJI PROJEKTU SPEŁNIONY ZOSTANIE CEL GŁÓWNY PROJEKTU TJ. ZWIĘKSZANIE OSZCZĘDNOŚCI ENERGII ORAZ POPRAWA CZYSTOŚCI POWIETRZA W GMINIE SŁAWNO. GRUPA DOCELOWA: BEZPOŚREDNIA: MIESZKAŃCY GMINY SŁAWNO, OSOBY PRZEJEZDNE, KORZYSTAJĄCE Z INFRASTRUKTURY PUBLICZNEJ ORAZ TURYŚCI ODWIEDZAJĄCY GMINĘ SŁAWNO (Polish)
    0 references
    THE PROJECT CONSISTS OF THE CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT ON SECTIONS: • SZADKOWICE – ANTONIÓWKA: 17 LIGHT POINTS WITH LED LUMINAIRES AND 2 ACTIVE CHARACTERS POWERED FROM THE PHOTOVOLTAIC MODULE • FRATERNAL STONES: 29 LIGHT POINTS WITH LED LUMINAIRES • PRIMITIVE WILL: 33 LIGHT POINTS WITH LED LUMINAIRES WILL BE BUILT IN TOTAL 79 LIGHT POINTS WITH LED LUMINAIRES AND 2 ACTIVE SIGNS POWERED FROM THE PHOTOVOLTAIC MODULE (RES) THE PLANNED INVESTMENT IS PART OF A WIDER INFRASTRUCTURE PROJECT, SIMULTANEOUSLY IMPLEMENTED AND FINANCED BY THE BENEFICIARY – MORE IN POINT. 6,6 WATER. CURRENT HIGH COSTS FOR LIGHTING PUBLIC PLACES: • GENERATE HIGH LIGHTING COSTS • INCREASE POLLUTION • HIGH LIGHTING COSTS CAUSE THAT THE NUMBER OF NEW INVESTMENTS DOES NOT INCREASE IN PROPORTION TO THE NEEDS • ARE RELATED TO THE UNUSED ENERGY-EFFICIENT AND ENVIRONMENTALLY FRIENDLY SYSTEMS (RES). THE NECESSARY MEASURES TO BE IMPLEMENTED ARE: TASKS: 1. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT IN THE TOWNS OF SZADKOWICE AND ANTONIÓWKA. 2. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING DEVICES IN THE VILLAGES AND STONE. 3. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING DEVICES IN THE VILLAGE OF PRYMUSOWA WILL. 4. PROMOTION OF THE PROJECT. 5. IT’S INVESTOR SUPERVISION. SPECIFIC TECHNICAL REQUIREMENTS. THEY'RE IN SW ROZ. 4 AND. 3. OBJECTIVES: THROUGH THE IMPLEMENTATION OF THE PROJECT, THE MAIN OBJECTIVE OF THE PROJECT WILL BE MET, I.E. INCREASING ENERGY SAVINGS AND IMPROVING AIR PURITY IN THE MUNICIPALITY OF SŁAWNO. TARGET GROUP: DIRECT: RESIDENTS OF THE MUNICIPALITY OF SŁAWNO, PASSERS-BY, USING PUBLIC INFRASTRUCTURE AND TOURISTS VISITING THE MUNICIPALITY OF SŁAWNO (English)
    17 October 2020
    0 references

    Identifiers

    RPLD.04.03.02-10-0011/16
    0 references