Modernisation of the Świnoujście water track – Szczecin to a depth of 12.5 m (Q85886)

From EU Knowledge Graph
Revision as of 06:50, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q85886 in Poland
Language Label Description Also known as
English
Modernisation of the Świnoujście water track – Szczecin to a depth of 12.5 m
Project Q85886 in Poland

    Statements

    0 references
    1,226,448,000.0 zloty
    0 references
    294,347,520.0 Euro
    13 January 2020
    0 references
    1,442,880,000.0 zloty
    0 references
    346,291,200.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    24 June 2016
    0 references
    31 December 2022
    0 references
    URZĄD MORSKI W SZCZECINIE
    0 references
    0 references

    53°32'42.4"N, 15°33'58.3"E
    0 references
    Projekt obejmuje wykonanie prac w zakresie: a) pogłębienie toru do 12,5 m z równoczesnym jego poszerzeniem (w tym wykonanie mijanek) na odcinkach prostych oraz z odpowiednimi poszerzeniami na łukach i na odcinkach przejściowych w dnie wraz z niezbędnymi korektami geometrii toru wodnego (ok. 62 km); b) przebudowę (regulację) skarp brzegowych bez umocnień; c) niwelację dna w strefie Świnoujścia (od proj. km ~5+134 do km ~16+640, obejmująca m.in. Kanał Mieliński i Kanał Piastowski) – ze względu na układ batymetryczny wykazujący znaczne lokalne przegłębienia w dnie toru; d) budowę i przebudowę umocnień brzegowych i budowli hydrotechnicznych wraz z przylegającą infrastrukturą; dotyczyć to będzie umocnienia skarp podwodnych przy nabrzeżach Huk, Żeglarskiego, BON, Gnieźnieńskiego oraz umocnienie skarpy obrotnicy Orli Przesmyk; e) przebudowę sieci branżowych w miejscach kolizji z modernizacją toru; f) pogłębienie i poszerzenie obrotnic statków: - na wysokości Polic, - przy Przesmyku Orlim na przekopie Mieleńskim u wejścia do Kanału Grabowskiego, - w Porcie Szczecin – na połączeniu Kanału Grabowskiego i Basenu Dębickiego. Projekt obejmuje również: - przystosowanie i modernizację istniejącego oznakowania nawigacyjnego i elementów systemu kontroli ruchu statków do nowej geometrii toru wodnego oraz modernizację obiektów Bazy Oznakowania Nawigacyjnego, - budowę nowych lub rozbudowę istniejących pól refulacyjnych bądź budowę sztucznych wysp wraz ze zlokalizowanymi na nich przystaniami, na Zalewie Szczecińskim niezbędnych do zdeponowania urobku wydobytego podczas prac pogłębiarskich związanych z modernizacją toru wodnego; - pozyskanie gruntów pod budowle, konieczne rozbiórki kolidujących obiektów istniejącego zagospodarowania, wykonanie wycinek drzew i krzewów oraz ewentualnych wylesień. Zakresem projektu objęto również odcinek Kanału Grabowskiego o długości ok. 0,43 km. (Polish)
    0 references
    The project covers the execution of works on: a) deepening the track to 12,5 m with the simultaneous extension of the track (including passing passings) on straight sections and with appropriate extensions on curves and on transition sections in the bottom, together with necessary adjustments to the geometry of the water track (approx. 62 km; reconstruction (regulation) of shore scarves without fortifications; C) levelling of the bottom in the zone of Świnoujście (from km ~5+ 134 to km ~16+ 640, including among others. Mieliński Canal and Piast Canal) – due to the Batymmetric system showing significant local pits in the bottom of the track; the construction and reconstruction of shore fortifications and hydrotechnical structures, together with adjacent infrastructure; this will include the fortification of underwater slopes at the shores of Huk, Sailing, BON, Gniezno and the strengthening of the slope of the turntable of Orla Przesmyk; e) Reconstruction of sectoral networks in places of collision with track modernisation; deepening and expanding the rotary vessels: — at the height of the Police, at the Orlim Pass on the Mielenski pier at the entrance to the Grabowski Canal, – in Port Szczecin – on the connection of Grabowski Canal and the Dębicki Basin. The project shall also include: — the adaptation and modernisation of the existing navigation marking and vessel traffic control system components to the new geometry of the track and the modernisation of the Navigation Base facilities, – the construction of new or expansion of existing refurbishment fields or the construction of artificial islands, along with their berths, in the Szczecin Sea, necessary to deposit the product extracted during dredging works related to the modernisation of the water track; — acquisition of land for buildings, necessary demolition of the conflicting facilities of the existing development, the execution of cuttings of trees and shrubs and possible deforestation. The scope of the project was also covered by a section of the Grabowski Canal with a length of approx. It’s 0,43 miles. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.03.02.00-00-0012/17
    0 references
    4862
    0 references