Analysis of areas with significant flood risk within the territorial scope of the State Enterprise Vltava River Basin, including proposals for possible flooding measures (subject to the Flood Risk Management Plan in the Elbe Basin) (Q58997)
Jump to navigation
Jump to search
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Analysis of areas with significant flood risk within the territorial scope of the State Enterprise Vltava River Basin, including proposals for possible flooding measures (subject to the Flood Risk Management Plan in the Elbe Basin) |
Project in Czech Republic financed by DG Regio |
Statements
28,045,738.1 Czech koruna
0 references
32,994,986.0 Czech koruna
0 references
85 percent
0 references
7 June 2018
0 references
31 July 2022
0 references
Povodí Vltavy, státní podnik
0 references
15000
0 references
Podklady pro 2. plánovací období podle Povodňové směrnice - aktualizace map povodňového nebezpečí a povodňových rizik pro oblasti s významným povodňovým rizikem v dílčích povodí Horní Vltavy, Berounky a Dolní Vltavy zpracování nových map v nově vymezených OsVPR, návrhy efektivních opatření a jejich předjednání s dotčenými subjekty. Součástí je zpracování Dokumentací oblastí s významným povodňovým rizikem, které jsou hlavním podkladem pro zpracování samotných plánů pro zvládání povodňových rizik. (Czech)
0 references
Documents for the 2nd Flood Planning Period – updates of flood hazard maps and flood risks for areas with significant flood risk in sub-water basins of Horní Vltava, Berounka and Lower Vltava rivers processing new maps in newly defined OsVPR, proposals for effective measures and their presentation with interested entities. Documentation of areas with significant flood risk, which is the main basis for the preparation of plans for flood risk management themselves. (English)
23 October 2020
0 references
Identifiers
CZ.05.1.24/0.0/0.0/17_064/0005368
0 references