Hot water connection CZT objects Apex, Harantova and N. 2595 Sand (Q19058)

From EU Knowledge Graph
Revision as of 17:19, 22 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Within the planned transition from steam to hot water in the area of the East hot water and the technical condition of the original steam and condensate distribution to customers np. 2595, VS Harantova and Apex are planned to replace existing steam pipelines with hot water distributions from pre-insulated pipelines. 242 m of the original route will be reconstructed. a., translated_summary)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Hot water connection CZT objects Apex, Harantova and N. 2595 Sand
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,044,491.25 Czech koruna
    0 references
    41,779.65 Euro
    10 January 2020
    0 references
    2,611,228.0 Czech koruna
    0 references
    104,449.12 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    29 March 2018
    0 references
    31 October 2018
    0 references
    30 November 2018
    0 references
    Teplárna Písek, a.s.
    0 references

    49°18'27.43"N, 14°9'5.47"E
    0 references

    49°19'14.09"N, 14°8'36.24"E
    0 references
    39701
    0 references
    V rámci plánovaného přechodu z páry na horkou vodu v oblasti Horkovodu Východ a technického stavu původního parního a kondenzátního rozvodu k odběratelům čp. 2595, VS Ha-rantova a Apex je plánováno nahradit stávající parovody horkovodními rozvody z předizolovaného potrubí. Rekonstruováno bude 242 m původní trasy. a. (Czech)
    0 references
    Within the planned transition from steam to hot water in the area of the East hot water and the technical condition of the original steam and condensate distribution to customers np. 2595, VS Harantova and Apex are planned to replace existing steam pipelines with hot water distributions from pre-insulated pipelines. 242 m of the original route will be reconstructed. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.15/0.0/0.0/16_064/0011889
    0 references