Szt – hot water connection and VS – AC Blue Star (Q19048)

From EU Knowledge Graph
Revision as of 17:19, 22 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Connection of a new sampling point using a hot water pipe of 175,5 bm. The event also includes the installation of the object transfer station and power approx. 800 kWt. The newly built Blue Star administrative centre is located at the intersection of Mánesova and Lidická tř. a., translated_summary)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Szt – hot water connection and VS – AC Blue Star
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,092,124.0 Czech koruna
    0 references
    43,684.96 Euro
    10 January 2020
    0 references
    2,730,310.0 Czech koruna
    0 references
    109,212.40 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    28 August 2017
    0 references
    27 February 2018
    0 references
    31 July 2018
    0 references
    Teplárna České Budějovice, a.s.
    0 references

    48°57'40.28"N, 14°27'20.84"E
    0 references
    37001
    0 references
    Připojení nového odběrného místa pomocí teplovodního potrubí v délce 175,5 bm. Součástí akce je i montáž objektové předávací stanice a výkonu cca. 800 kWt. Nově budovaná stavba administrativního centra Modrá hvězda se nachází u křižovatky ulic Mánesova a Lidická tř. a. (Czech)
    0 references
    Connection of a new sampling point using a hot water pipe of 175,5 bm. The event also includes the installation of the object transfer station and power approx. 800 kWt. The newly built Blue Star administrative centre is located at the intersection of Mánesova and Lidická tř. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.15/0.0/0.0/16_064/0011797
    0 references