Reconstruction of the residential House of the Comoros Lhotka 281 (Q75574)

From EU Knowledge Graph
Revision as of 22:52, 23 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Within the framework of the reconstruction of the apartment house there will be inter alia thermal insulation of the outer shell and insulation of the ceiling above the last floor. Unsatisfactory hole fillings will be replaced. In addition, repairs of lightning conductors and plumbing elements will be carried out within the framework of the reconstruction. The objective of the project will be achieved by fulfilling all measures resulting from th...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the residential House of the Comoros Lhotka 281
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    489,126.55 Czech koruna
    0 references
    19,565.06 Euro
    10 January 2020
    0 references
    1,630,421.84 Czech koruna
    0 references
    65,216.87 Euro
    10 January 2020
    0 references
    30.0 percent
    0 references
    1 January 2017
    0 references
    31 August 2017
    0 references
    31 August 2017
    0 references
    Společenství vlastníků jednotek domu čp. 281, Komorní Lhotka
    0 references
    0 references

    49°40'26.0"N, 18°31'43.3"E
    0 references
    73953
    0 references
    V rámci rekonstrukce bytového domu dojde mimo jiné k zateplení obvodového pláště a zateplení stropu nad posledním podlažím. Nevyhovující otvorové výplně budou vyměněny. Dále budou v rámci rekonstrukce provedeny opravy hromosvodů a klempířských prvků. Cíl projektu bude dosažen splněním všech opatření vyplývajících z projektové dokumentace. (Czech)
    0 references
    Within the framework of the reconstruction of the apartment house there will be inter alia thermal insulation of the outer shell and insulation of the ceiling above the last floor. Unsatisfactory hole fillings will be replaced. In addition, repairs of lightning conductors and plumbing elements will be carried out within the framework of the reconstruction. The objective of the project will be achieved by fulfilling all measures resulting from the project documentation. (English)