Makovice — Anti-erosion curve, sedimentation tank (Q58620)

From EU Knowledge Graph
Revision as of 10:17, 23 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The object of the project is to implement measures within the specific objective 1.3.3 leading to the capture of surface-flowing water from land in the cadastral area of the village Močovice in the district of Kutná Hora between the road Močovice – Kluky and the middle ravine. The land concerned, on which the project will build an anti-erosion ditch and a slip-through sedimentation tank are p.No. 350/2, 641/9, 641/11 and 652/11., translated_summary)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Makovice — Anti-erosion curve, sedimentation tank
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    404,800.51 Czech koruna
    0 references
    16,192.02 Euro
    10 January 2020
    0 references
    476,235.9 Czech koruna
    0 references
    19,049.44 Euro
    10 January 2020
    0 references
    85.0 percent
    0 references
    20 September 2017
    0 references
    30 March 2020
    0 references
    Obec Močovice
    0 references
    0 references
    0 references

    49°53'18.89"N, 15°23'7.22"E
    0 references
    28601
    0 references
    Předmětem projektu je realizace opatření v rámci specifického cíle 1.3.3 vedoucího k zachycení povrchově odtékající vody z pozemků v katastrálním území obce Močovice v okrese Kutná Hora mezi silnicí Močovice - Kluky a střední strží. Dotčenými pozemky, na kterých bude v rámci projektu vybudován protierozní příkop a sedimentační nádrž se skluzem jsou p.č. 350/2, 641/9, 641/11 a 652/11. (Czech)
    0 references
    The object of the project is to implement measures within the specific objective 1.3.3 leading to the capture of surface-flowing water from land in the cadastral area of the village Močovice in the district of Kutná Hora between the road Močovice – Kluky and the middle ravine. The land concerned, on which the project will build an anti-erosion ditch and a slip-through sedimentation tank are p.No. 350/2, 641/9, 641/11 and 652/11. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.24/0.0/0.0/16_045/0004601
    0 references