Klubíčko Na Valše 1. (Q55303)

From EU Knowledge Graph
Revision as of 09:28, 23 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The number of project supported by the OPZ Call No. 03_16_132, followed by this project, is CZ.03.1.51/0.0/0.0/16_132/0006982,-accurate address of the children’s operation site: Main 401, Štěchovice, 252 07, children’s group will be operated on the 1st floor of this building, which is accessible by a separate staircase.-capacity of children’s group, i.e. number of seats:12-total project schedule: From 1.11.2019 to 30.4.2022.- it is a public chil...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Klubíčko Na Valše 1.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    3,037,050.0 Czech koruna
    0 references
    121,482.0 Euro
    10 January 2020
    0 references
    3,573,000.0 Czech koruna
    0 references
    142,920.0 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    1 November 2019
    0 references
    30 April 2022
    0 references
    Klubíčko Na Valše, z. s.
    0 references
    0 references
    0 references

    49°51'2.84"N, 14°23'42.50"E
    0 references
    25207
    0 references
    -číslo projektu podpořeného z OPZ výzvy č. 03_16_132, na který tento projekt navazuje, je CZ.03.1.51/0.0/0.0/16_132/0006982,-přesná adresa místa provozu dětské skupiny: Hlavní 401, Štěchovice, 252 07, dětská skupina bude provozována v 1. patře této budovy, které je dostupné po samostatném schodišti.-kapacita dětské skupiny, tj. počet míst:12-celkový harmonogram projektu: Od 1.11.2019 do 30.4.2022.- jedná se o veřejnou dětskou skupinu. (Czech)
    0 references
    The number of project supported by the OPZ Call No. 03_16_132, followed by this project, is CZ.03.1.51/0.0/0.0/16_132/0006982,-accurate address of the children’s operation site: Main 401, Štěchovice, 252 07, children’s group will be operated on the 1st floor of this building, which is accessible by a separate staircase.-capacity of children’s group, i.e. number of seats:12-total project schedule: From 1.11.2019 to 30.4.2022.- it is a public children’s group. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.03.1.51/0.0/0.0/19_101/0015042
    0 references