The construction of micro-photovoltaic equipment by SUMARA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOSCIA (Q137772)

From EU Knowledge Graph
Revision as of 14:50, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
The construction of micro-photovoltaic equipment by SUMARA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOSCIA
Project in Poland financed by DG Regio

    Statements

    0 references
    172,220.0 zloty
    0 references
    41,332.80 Euro
    13 January 2020
    0 references
    218,000.0 zloty
    0 references
    52,320.0 Euro
    13 January 2020
    0 references
    79.0 percent
    0 references
    29 December 2017
    0 references
    30 October 2018
    0 references
    "SUMARA" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    Inwestycja objęta niniejszym projektem polega na zakupie i montażu mikroinstalacji fotowoltaicznej. Projekt wpisuje się w typ projektu wymieniony w SzOOP RPO 2.10. Instalacje będą służyły potrzebom własnym i będą podłączone do sieci, jednakże ze względu na moc instalacji (do 40 kW) zgodnie z art. 5 ustawy o odnawialnych źródłach energii ( Dz.U. 2015 poz. 478) oraz Art. 7 ust. 8d ze znaczkiem 4-9 ustawy – Prawo energetyczne (Dz.U. Dz.U. 1997 nr 54 poz. 348) będą one dokonywane na podstawie zgłoszenia bez konieczności posiadania przez beneficjenta ważnych technicznych warunków przyłączenia do sieci. Wnioskodawca posiada obecnie przyłącza gdzie moc umowna wynosi 100 kW. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP. Niniejszy projekt zakłada dostawę i montaż dachowej instalacji fotowoltaicznej - 152 paneli (polikrystalicznych) o mocy 39,52 kW z falownikiem, niezbędnym okablowaniem i osprzętem. Panele pv wykorzystują zjawisko fotowoltaiczne do przetwarzania promieniowania słonecznego na energię elektryczną. Za pomocą połączeń kablowych przekazują one energię do falowników, gdzie następuje zmiana prądu stałego w prąd zmienny. Elektrownia będzie podłączona do sieci, natomiast nie będzie potrzeby instalowania akumulatorów oraz regulatorów ładowania, ponieważ sieć jest w stanie przyjąć całą wyprodukowaną energię. Wyprodukowana energia będzie wykorzystywana na potrzeby własne a ewentualna nadwyżka będzie wprowadzona do sieci. Projekt zostanie zakończony w ciągu 1 roku od podpisania um. o dofinansowanie. (Polish)
    0 references
    The investment covered by this project consists of the purchase and installation of a micro-PV. The project is part of the project type mentioned in the SzOP ROP 2.10. Installations will serve specific needs and will be connected to the grid, but due to the power of the installation (up to 40 kW) in accordance with Article 5 of the Renewable Energy Act (Journal of Laws 2015, item (478) and Article 7 (1) 8d with 4-9 Act — Energy Law (Journal of Laws 1997/54, item) 348) will be made on the basis of the notification without the beneficiary having to have a valid technical connection to the network. The applicant currently has a connection where the contractual power is 100 kW. The project meets all boundary conditions laid down in the SzOOP. This project involves the delivery and installation of a rooftop photovoltaic installation — 152 panels (polycrystalline), with a power output of 39.52 kW, having a false, essential wiring and fittings. Pv panels are using solar radiation to convert solar radiation into electricity. By cable, they transmit energy to inverters where there is a change in direct current into alternating current. The plant will be connected to the grid and there will be no need to install batteries and recharging regulators as the network is capable of absorbing all the energy produced. The energy produced will be used for its own account and any surplus will be entered into the network. The project will be completed within 1 year after signature of the grant. (English)
    0 references

    Identifiers

    RPZP.02.10.00-32-B113/17
    0 references