Construction of PSZOK in the municipality of Jaraczewo. (Q134995)

From EU Knowledge Graph
Revision as of 16:18, 21 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The object of the project is the construction of the Municipal Waste Collection Point (PSZOK) located on the ground of the plot no.425/2.The project was divided into four tasks:Zad 1 Construction of a separate collection point for municipal waste, including:-container of a social office building with a steel supporting structure, according to the guidelines of the manufacturer of prefabricated container and media: water supply, rainwater drainag...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of PSZOK in the municipality of Jaraczewo.
Project in Poland financed by DG Regio

    Statements

    0 references
    597,823.76 zloty
    0 references
    143,477.70 Euro
    13 January 2020
    0 references
    703,322.08 zloty
    0 references
    168,797.3 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 July 2019
    0 references
    31 August 2020
    0 references
    GMINA JARACZEWO
    0 references
    Przedmiotem projektu jest budowa Punktu Selektywnej Zbiórki Odpadów Komunalnych (PSZOK) zlokalizowanego na gruncie działki o nr ewid.425/2.Projekt został podzielony na cztery zadania:Zad 1 Budowa punktu selektywnej zbiórki odpadów komunalnych, w tym:-kontenerowego budynku socjalno-biurowego o stalowej konstrukcji nośnej obiektu, zgodnie z wytycznymi producenta prefabrykowanego kontenera wraz z mediami: wodociąg, kanalizacja deszczowa, instalacja elektryczna-murów oporowych do rampy załadowczej o wysokości: 205 cm oraz szerokości: 99 cm-zbiornika bezodpływowego na ścieki sanitarne,-utwardzenie terenu w postaci betonowej kostki brukowej o wytrzymałości na ściskanie nie mniejszej niż 50 MPa z uwzględnieniem warstw przekrojowych:-Kostka brukowa gr.8cm, Podsypka piaskowo cementowa 2,5-5MPa gr. 4cm, Beton C12/15 gr. 30cm, podsypka piaskowa Is=0,99 gr.40cm-postawienie bramy samonośnej wysięgnikowo zawieszonej nad wjazdem. Brama składająca się z szyny jezdnej, zespołu jezdnego, konstrukcji zamkniętejskrzydła bramy, ramy prowadzącej,słupa zamykającego wyposażonego w chwytak oraz podpory tylnej stabilizującej skrzydło-ogrodzenie za pomocą panela kratowego zgrzewanego z prętów stalowych (poziomych podwójnych i pionowych pojedynczych.Wyposażenie PSZOK w kontenery: 5 sztuk o poj. 18 m3 (4500x2300x1750 mm)oraz 5 sztuk o poj, 7m3 (4500x1700x1000 mm), 1 szt o poj. 30m3(6500*2300*2000) oraz 1 szt o poj. 15 m3 (3700*2200*1900)Liczba kampanii informacyjno-edukacyjnych związanych z gospodarką odpadami wynosi 1. Liczba wspartych Punktów Selektywnego Zbierania Odpadów Komunalnych wynosi 1. Zad 2 Promocja projektu polegająca na przygotowaniu i umieszczeniu na stałe tablicy pamiątkowej po zakończeniu projektu, a w czasie realizacji projektu tablicy informacyjnej.Zad 3 Edukacja ekologiczna- projekt ulotek i plakatu, druk ulotek i plakatu oraz konkurs wiedzy ekologicznej z nagrodami.Zad 4 Inspektor nadzoru.Łączny koszt inwestycji to 871 236,16 zł. w tym koszty kwalifikowane to: 708 322,08 zł (Polish)
    0 references
    The object of the project is the construction of the Municipal Waste Collection Point (PSZOK) located on the ground of the plot no.425/2.The project was divided into four tasks:Zad 1 Construction of a separate collection point for municipal waste, including:-container of a social office building with a steel supporting structure, according to the guidelines of the manufacturer of prefabricated container and media: water supply, rainwater drainage system, electrical dams for loading ramp with height: 205 cm and width: 99 cm-water-free tank for sanitary sewage,-heavy ground in the form of concrete paving cube with compressive strength of not less than 50 MPa including cross-sectional layers:-Cobbler gr.8cm, sandbag cement 2.5-5MPa gr. 4 cm, Concrete C12/15 gr. 30 cm, sand-sprinkled Is=0,99 gr.40cm-position of the self-contained gate. Gate consisting of a road rail, a mobile unit, a closed door wing structure, a guide frame, a clamping post equipped with a gripper and a rear support stabilising the wing-garden by means of a welded grid panel made of steel rods (horizontal double and vertical singles.PPSOK equipment with containers: 5 pieces in a room. 18 m³ (4500x2300x1750 mm) and 5 pieces with a poj, 7 m³ (4500x1700x1000 mm), 1 pcs with capacity. 30 m³(6500*2300*2000) and 1 pcs. 15 m³ (3700*2200*1900)The number of information and education campaigns related to waste management is 1. The number of supported Municipal Waste Collection Points is 1. Zad 2 Project promotion consisting of preparing and permanently placing a commemorative plaque after the completion of the project, and during the implementation of the information board project.Zad 3 Environmental education – flyer and poster project, printing of leaflets and posters and a competition of ecological knowledge with prizes.Zad 4 Supervisory Inspector.The total cost of the investment is PLN 871,236.16. 708 322,08 PLN (English)
    21 October 2020
    0 references

    Identifiers

    RPWP.04.02.01-30-0013/18
    0 references