No label defined (Q132710)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
751,470.82 zloty
0 references
1,130,014.32 zloty
0 references
66.5 percent
0 references
3 January 2014
0 references
31 December 2020
0 references
WSPÓLNOTA MIESZKANIOWA NIERUCHOMOŚCI 10-117 OLSZTYN, UL. 1 MAJA 11
0 references
Zakres proj. obejmuje 1 budynek wielorodz. położ. w Olsztynie przy ul. 1 Maja 11 o łącznej pow. użyt. 1024,78 m2. Budynek wpisany do rej. zabytków pod nr : A-1818. W wybranym do realiz. wariancie stanow. przedmiot niniejszego projektu nowa jakość budynku oraz przestrz. zostanie uzysk. poprzez następ. usprawn.: prace rem-kons elewacji, klatki schod., piwnicy, dachu, stolarki okiennej i drzwiow. klatki schod. i piwnic, wym. inst. wod.-kan. stan. część wspólną oraz przyłącza, inst. domof. z kodem Brailla, ośw. automat., ozn. kontrast., mont. budek ornit. Znaczna poprawa stanu zachow. budynku i jego efektyw. energet. (poprzez inst. czujek oszczędz. en. elektr. w częściach wspól. budynku) oraz estetyki. Zainst. zost. nakł. braile'a na domofon. Więcej w rozdz. 1.1 sw; Interesar. przedm. projektu są mieszkańcy kamienicy, a tym samym obszaru rewit., turyści, służby konserw., Gm. Olsztyn. Szczeg. inform. na temat zakresu rzecz. i przyjętych rozwiąz. znajduje się w rozdz. 2.2 sw. oraz w wyciągu z dokum. techn. będącej załączn. do wniosku. Cały zakres inw. wdraż. będzie przez beneficj., tj. Wsp. Mieszk. Nier. przy ulicy 1 Maja 11, która wraz z podm. współpr. zapewni zespół osób odpow. za wdroż. projektu, którzy posiadają kwalif. i doświad. w realiz. projektów , co potwierdza rozdział 2.4 studium. Projekt po jego zakoń. jednozn. rozw. jeden z istotn. probl. dotycz. najbardz. zniszcz. i zaniedb. infrastr. techn. przy ul. 1 Maja 11 w Olsztynie oraz będzie przeciwdz. margin. znacznych grup mieszk. zdegrad. społecz. i ekon, charakt. się zabytk. zabud. otoczenia. W istotny sposób przyczyni się także do społ. aktyw. mieszk. i wpłynie na obniż. poziomu wyst. zjawisk patol. społ. na danym terenie. Proj. wpis. się w założ. SZOOP RPO WiM 2014-2020, Oś 8 Obsz. wymag. rewit., Cel tem. 9 Prom. Włącz. Społ., walka z ubóstw. i wsz. dysk rym., Prior. Inwest. 9 b – Wsp. rewit. fizycz., gosp. i społ. ubogich społ.na obsz. miejs. i wiejsk., Cel szcz.: Lepsza jak. życia społ. zam. ob. probl. (Polish)
0 references
The scope of the project covers 1 multi-gene building in Olsztyn, ul. 1 May 11 with total area of use. 1024,78 m². Building entered in the district of monuments under no.: IT’S A-1818. In the state variant selected for the implementation, the subject of this project is a new quality of the building and overhaul will be yielded by the following: works of rem-cons of facades, staircases, basement, roof, window joinery and doors. staircases and cellars, e.g. inst. water.-can. state. common part and connections, inst. domof. with Brailla code, d.o.v. automatic., ozn. contrast., mont. booth ornit. Significant improvement in the condition of maintenance of the building and its efficiency. energet. (through the inst. sensor save en. electr. in parts of the building) and aesthetics. Zainst. zost. put Braile on the intercom. More in chapters. 1.1 sw; Interests. before the project are residents of the tenement house, and thus the area of revvit., tourists, canned service., Gm. Olsztyn. Detailed information on the scope of the item. and accepted solutions can be found in chapter. 2.2 St. and in the techn. document extract annexed to the application. The whole range of inw. implementation. will be through the benefice., i.e. I'm all right. It’s a bellow. Nier. at 1 Maja 11, which together with the co-author will provide a team of people responsible for the implementation of the project, who have qualified and testimonials in the implementation of projects, which is confirmed by chapter 2.4 of the study. Project after its end. one. development one of the essential tests concerning. most destruction and neglect infrastr. techn. at ul. 1 May 11 in Olsztyn and will be counter-margin. significant groups of inhabitants. degrade. society. and ekon, charakt. up monument. buildings. surroundings. It will also significantly contribute to the community’s inhabitant activity and will reduce the level of pathol phenomena in a given area. Proj. entry. make a bet. SZOOP RPO WiM 2014-2020, Axis 8 Application, rewit., Target tem. It’s 9 Prom. Turn it on. Socially, the fight against poverty and the rhyme disc, Prior. It’s an investment. 9 b – physicist, gossip and community of the poor on urban areas and villages, Goalszcz: It’s better than a social life. (English)
21 October 2020
0 references
Identifiers
RPWM.08.01.00-28-0002/18
0 references