Extension and upgrading of the existing waste water treatment plant and construction of sections of the sanitary sewage system in the agglomeration Nowy Żmigrawa. (Q118910)

From EU Knowledge Graph
Revision as of 10:49, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Extension and upgrading of the existing waste water treatment plant and construction of sections of the sanitary sewage system in the agglomeration Nowy Żmigrawa.
Project in Poland financed by DG Regio

    Statements

    0 references
    3,929,245.99 zloty
    0 references
    943,019.04 Euro
    13 January 2020
    0 references
    4,622,642.37 zloty
    0 references
    1,109,434.17 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    4 July 2015
    0 references
    31 October 2018
    0 references
    GMINA NOWY ŻMIGRÓD
    0 references
    Celem ogólnym projektu jest poprawa stanu środowiska naturalnego skutkująca stymulacją rozwoju gospodarczego Gminy Nowy Żmigród. Planowane przedsięwzięcie polega na rozbudowie istniejącej oczyszczalni ścieków w Nowym Żmigrodzie, zlokalizowanej na działce nr 4/3. Celem przedsięwzięcia jest zwiększenie przepustowości hydraulicznej oczyszczalni o przepustowości Qśrd = 500m3/d do przepustowości Qśrd = 1000m3/d oraz maksymalnego przepływu dobowego Qmaxd = 1200m3/ . W ramach rozbudowy i modernizacji wykonana zostanie budowa i montaż nowych elementów oczyszczalni, wymiana i dostosowanie istniejących elementów oczyszczalni, montaż układu zasilania fotowoltaicznego na terenie oczyszczalni oraz w ramach infrastruktury technicznej – budowa nowych rurociągów technologicznych i przełożenie części istniejącego wodociągu. Technologia oczyszczania ścieków pozostaje bez zmian. Po modernizacji oczyszczalnia będzie mogła przyjmować ścieki od 8400 równoważnych mieszkańców (RLM) (obecnie 3143 RLM). Planowane przedsięwzięcie polega także na wykonaniu sieci kanalizacji sanitarnej grawitacyjnej z przyłączami, której celem jest odprowadzenie ścieków do istniejącej oczyszczalni ścieków komunalno-bytowych zlokalizowanej w miejscowości Nowy Żmigród. Projekt kanalizacji sanitarnej w miejscowościach Mytarz, Mytarka oraz część Nowego Żmigrodu obejmuje gospodarstwa, których właściciele wyrazili chęć przyłączenia do projektowanej kanalizacji i jest to możliwe do wykonania pod względem technicznym.Wskaźnik produktu które zostaną osiągnięte dzięki realizacji projektu to; 1 rozbudowana oczyszczalnia ścieków komunalnych, 2,91 km wybudowanej kanalizacji sanitarnej, natomiast wskaźnik rezultatu osiągnięte dzięki realizacji projektu to; Liczba utrzymanych miejsc pracy - 1, Wielkość ładunku ścieków poddanych ulepszonemu oczyszczaniu - 0 RLM, Liczba dodatkowych osób korzystających z ulepszonego oczyszczania ścieków - 75 RLM. (Polish)
    0 references
    The general objective of the project is to improve the natural environment resulting in the stimulation of the economic development of the municipality of Nowy Żmigrawa. The planned project consists of the extension of the existing wastewater treatment plant in Nowy Żmigroda, located on plot No 4/3. The purpose of the project is to increase the hydraulic capacity of the treatment plant with the capacity of Qwrd = 500 m³/d to the capacity of Qwrd = 1 000 m³/d and the maximum daily flow Qmax = 1 200 m³/. In the context of the extension and upgrading, the construction and installation of new elements of the plant, the replacement and adaptation of existing elements of the treatment plant, installation of the photovoltaic installation within the plant and within the technical infrastructure will be carried out, the construction of new technology pipelines and the transmission of part of the existing water supply. The technology of waste water treatment remains unchanged. After modernisation, the plant will be able to accept waste water from a population of 8400 equivalent (p.e.) (currently 3143 p.e.). The planned project also consists of the implementation of a gravitational sanitary sewerage network with connections in order to discharge the waste water to the existing municipal and domestic waste water treatment plant located in the town of Nowy Żmigrawa. The sewage project in Mytarz, Mytarka and the part of Nowy Żmigrow comprises farms whose owners have expressed a desire to connect to the planned sewage and this is technically feasible. the product indicator will be achieved through the implementation of the project; 1, an upgraded urban waste water treatment plant, 2.91 km of the constructed sanitary sewage system, and the result achieved by the project; Number of jobs maintained — 1, load of wastewater subject to improved treatment — 0 p.e., Number of additional persons served by improved wastewater treatment — 75 p.e.. (English)
    0 references

    Identifiers

    RPPK.04.03.01-18-0020/16
    0 references