Umbrella project, renewable micro-installations in the municipality of Sokolów Małopolska (Q118501)

From EU Knowledge Graph
Revision as of 20:51, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Umbrella project, renewable micro-installations in the municipality of Sokolów Małopolska
Project in Poland financed by DG Regio

    Statements

    0 references
    9,985,290.0 zloty
    0 references
    2,396,469.6 Euro
    13 January 2020
    0 references
    11,747,400.0 zloty
    0 references
    2,819,376.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    8 March 2017
    0 references
    30 November 2020
    0 references
    GMINA SOKOŁÓW MAŁOPOLSKI
    0 references
    Głównym celem projektu jest uzyskanie dodatkowej zdolności wytwarzania energii elektrycznej i cieplnej ze źródeł odnawialnych. Aby spełnić ten cel planuje się: zakup instalacji fotowoltaicznych, instalacji solarnych z zasobnikami ciepłej wody oraz kotłów na biomasę, tj.:510 instalacji paneli fotowoltaicznych, w tym: 10 szt. o mocy 2,7 kW, 458 szt. o mocy 3,24, kW i 42 szt. o mocy 4,59 kW. 60 kotłów na biomasę , w tym: 9 szt. o mocy 12 kW, 23 szt. o mocy 16 kW, 21 szt. o mocy 20 kW , 4 szt. o mocy 24 kW, 3 szt. o mocy 30 kW. 335 instalacji solarnych z zasobnikami wody, do grzania wody, w tym: 292 szt. o mocy 3,166 kW, 36 szt. o mocy 4,749 kW i 7 szt. o mocy 6,332 kW. Instalacje panelowe i kotły będą wyposażone w niezbędne urządzenia, aparatury , czujniki, urządzenia pomiarowe i zabezpieczające, tak aby zachować wymogi bezpieczeństwa i trwałości projektu. Projekt będzie realizowany w formule zaprojektuj i wybuduj. (Polish)
    0 references
    The main objective of the project is to obtain an additional capacity to generate electricity and heat from renewable sources. To meet this objective it is planned to: purchase of photovoltaic installations, solar hot water storage installations and biomass boilers, i.e. 510 solar panels installations, including: 10 units with a power of 2.7 kW, 458 units with a power of 3,24, kW and 42 units, with a power of 4.59 kW. 60 biomass boilers, including: 9 with a power of 12 kW, 23 with a power of 16 kW, 21 with a power of 20 kW, 4 units with a power of 24 kW, 3 units with a power of 30 kW. 335 solar water installations with water reservoirs, to heat water, including: 292 with a power of 3.166 kW, 36 with a power of 4.749 kW and 7 kW with a power of 6.332 kW. Panel installations and boilers shall be equipped with the necessary equipment, equipment, sensors, measuring and securing devices to maintain the safety and durability requirements of the project. The project will be carried out in design and demolition. (English)
    0 references

    Identifiers

    RPPK.03.01.00-18-0063/17
    0 references