Reconstruction and extension of the basic school building. Prof. J. Tischner in Stary Sączu, Professor 1: Installation of a gym with the hinterland (Q114398)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction and extension of the basic school building. Prof. J. Tischner in Stary Sączu, Professor 1: Installation of a gym with the hinterland |
Project in Poland financed by DG Regio |
Statements
4,653,057.37 zloty
0 references
7,158,549.84 zloty
0 references
65.0 percent
0 references
1 June 2017
0 references
31 December 2019
0 references
GMINA STARY SĄCZ
0 references
Projektowaną rozbudowę sali gimnastycznej usytuowano w części południowej działki i styka się ścianą oddzielenia przeciwpożarowego z budynkiem istniejącej szkoły podstawowej. Część zabudowy kolidująca z projektowaną rozbudową przeznaczona jest do rozbiórki.Projektuje się drogę wewnętrzną wzdłuż granicy północnozachodniej. Drzewa kolidujące z projektowaną drogą przewidziano do wycinki w ilości 70 sztuk, a w zamian projektuje się nowe drzewa od strony południowej działki w ilości 59 sztuk. Przy drodze wewnętrznej zaprojektowano 38 miejsca postojowe dla obsługi budynku istniejącego i projektowanego. Istniejące ogrodzenie kolidujące z projektowaną budową drogi będzie zdemontowane i wykonane w granicy działki budowlanej. Dla części projektowanej przewidziano się nowe instalacje kanalizacji deszczowej, kanalizacji sanitarnej i wody realizowane na warunkach gestorów. Wzdłuż nowej drogi wewnętrznej projektuje się oświetlenie zewnętrzne. Przyłącza na bazie istniejących.BILANS TERENU:powierzchnia dz. budowlanej 1,3246hapow. zabudowy projektowanej 0,1719ha pow. zabudowy istniejącej 0,1494ha pow. utwardzona projektowana 0,3005haw tym:pow. utwardzona dróg 0,1227hapow. utwardzona chodników 0,1294hapow. utwardzona parkingów 0,0484hapow. utwardzona istniejąca 0,1985ha pow. biolog. czynna trawa 0,5043ha ZESTAWIENIE POWIERZCHNI DLA CAŁEGO BUDYNKU:Zestawienie powierzchni PRZED ROZBUDOWĄ I PRZEBUDOWĄ:POWIERZCHNIA UŻYTKOWA 2273,27 m2KUBATURA 9860,40 m3POWIERZCHNIA ZABUDOWY 1494,00 mZestawienie powierzchni OBJETEJ OPRACOWANIEM:POWIERZCHNIA UŻYTKOWA 2056,38 m2KUBATURA 19275,32 m3POWIERZCHNIA ZABUDOWY 1719,00 mZestawienie powierzchni PO ROZBUDOWIE I PRZEBUDOWIE:POWIERZCHNIA UŻYTKOWA 4329,65 m2KUBATURA 29135,72 m3POWIERZCHNIA ZABUDOWY 3213,00 m (Polish)
0 references
The planned extension of the gym is located in the southern part of the plot and is in contact with the wall of fire-separation with the building of the existing primary school. The part of the colliding with the design expansion is designed for demolition.The interior road along the northwest border is designed. Trees that interfere with the planned road are planned to be cut in a quantity of 70 pieces, and in return, new trees on the south side of the plot are designed in the amount of 59 pieces. On the internal road, 38 parking spaces were designed for the operation of the existing and designed building. The existing fence that conflicts with the design of the road will be dismantled and made at the border of the construction site. New rainwater, sanitary and water sewer systems are planned for the project. External lighting is designed along the new internal road. 3 1494 00 2056, 3 1494, 1494 00 2056, 2056 38 38, 38 38 38, 38 38, 38 38 38, 38 38 38, 38 38, 38 38, 38 38, 38 38, 38 38, 38 38, 38 38, 38 38, 38, 38, 38, 38, 38, 38, 1494, 2056, 38, 38, 38, 38, 38, 38, 1494, 2056, 38, 38, 38, 38, 38, 38, 38, 38, 1494, 40, 3, 1494, 1494, 1494, 00, 2056, 40, 3, 1494, 1494, 3, 1494, 1494, 00, 2056, 2056, 3 1494, 1494, 1494, 00, 2056, 3, 1494, 1494, 00, 2056, 3, 1494, 1494, 3, 1494, 3, 1494, 1494, 3, 1494, 3, 1494, 3, 1494, 3, 1494, 1494, 1494, 1494, 00, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 38, 2056, 38, 38, 38, 3, 1494, 1494, 00, 2056, 2056, 2056, 38, 38, 38, 38, 38, 38, 38, 38, 38, 38, 38, 38, 3, 1494, 00, 00, 2056, 2056, 2056, 2056, 2056, 38, 2056, 2056, 2056, 2056, 2056, 2056, 38, 2056, 2056, 2056, 2056, 38, 38, 38, 2056, 2056, 2056, 2056, 38, 38, 2056, 2056, 2056, 38, 38, 38, 2056, 38, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 40, 40, 3, 40, 3, 1494, 40, 3ccm, 40, 3, 1494, 00, 2056, 1494, 00, 2056, 2056, 2056, 2056, 2056, 3, 1494, 40, 3, 1494, 00, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 38, 2056, 2056, 38, 2056, 38, 38, 2056, 38, 2056, 38, 38, 2056, 38, 38, 2056, 38, 2056, 38, 2056, 2056, 2056, 38, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 2056, 38, 38, 2056, 38, (English)
20 October 2020
0 references
Identifiers
RPMP.11.01.02-12-0897/17
0 references