Eko-Energia for the municipality of Stin (Q104753)

From EU Knowledge Graph
Revision as of 16:56, 17 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The main objective of the project is to improve the quality of the environment in the Stanin Municipality related to the use of renewable energy sources. This objective will be achieved by installing solar installations and biomass boilers in private real estate in the municipality. The main objective will be achieved by the following specific objectives: increasing the use of renewable energy sources in the Stanin Municipality, reducing greenho...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Eko-Energia for the municipality of Stin
Project in Poland financed by DG Regio

    Statements

    0 references
    2,695,969.21 zloty
    0 references
    647,032.61 Euro
    13 January 2020
    0 references
    3,171,728.52 zloty
    0 references
    761,214.84 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 April 2016
    0 references
    10 December 2018
    0 references
    GMINA STANIN
    0 references
    0 references
    Celem głównym projektu jest poprawa jakości środowiska naturalnego w Gminie Stanin związana z wykorzystaniem odnawialnych źródeł energii. Cel ten zostanie osiągnięty poprzez montaż instalacji solarnych i kotłów na biomasę w prywatnych nieruchomościach na terenie gminy. Cel główny zostanie osiągnięty przez następujące cele szczegółowe: podniesienie poziomu wykorzystania odnawialnych źródeł energii w Gminie Stanin, redukcja wydzielanych do atmosfery gazów cieplarnianych i innych substancji szkodliwych: (pyłów, dwutlenku siarki (SO2), dwutlenku azotu (NO2), tlenku węgla (CO) i dwutlenku węgla (CO2), podniesienie potencjału gminy w zakresie turystyki oraz rozwoju przedsiębiorczości związane z poprawą jakości środowiska naturalnego. Kluczowym rezultatem projektu będzie poprawiona jakość środowiska naturalnego w Gminie Stanin. Rezultat ten zostanie osiągnięty poprzez zadania realizowane w ramach projektu, związane z montażem instalacji wykorzystujących odnawialne źródła energii w budynkach prywatnych mieszkańców Gminy. W jego ramach zamontowane zostaną kolektory słoneczne w 299 gospodarstwach domowych oraz kotły na biomasę w 12 nieruchomościach. Projekt przewiduje także wykorzystanie nowoczesnych technologii informacyjno-komunikacyjnych. Grupą docelową planowanego do realizacji projektu są mieszkańcy Gminy Stanin bezpośrednio uczestniczący w projekcie. Są to bezpośredni użytkownicy infrastruktury powstałej w wyniku realizacji projektu. Moc zamontowanych instalacji wyniesie: instalacje solarne 159 szt o mocy 3,4 kW, 107 szt o mocy 5,1 kW, 33 szt o mocy 6,8 kW (łączna moc instalacji 1,31397 MW); kotły na biomasę 1 szt o mocy 15 kW, 9 szt o mocy 20 kW, 2 szt o mocy 25 kW (łączna moc kotłów 0,245 MW) (Polish)
    0 references
    The main objective of the project is to improve the quality of the environment in the Stanin Municipality related to the use of renewable energy sources. This objective will be achieved by installing solar installations and biomass boilers in private real estate in the municipality. The main objective will be achieved by the following specific objectives: increasing the use of renewable energy sources in the Stanin Municipality, reducing greenhouse gases and other harmful substances in the atmosphere: (dust, sulphur dioxide (SO2), nitrogen dioxide (NO2), carbon monoxide (CO) and carbon dioxide (CO2), enhancing the town’s tourism potential and entrepreneurship related to improving the quality of the environment. The key result of the project will be improved environmental quality in the Stanin Municipality. This result will be achieved through tasks carried out within the framework of the project, connected with the installation of installations using renewable energy sources in private buildings of residents of the municipality. It will install solar collectors in 299 households and biomass boilers in 12 properties. The project also foresees the use of modern information and communication technologies. The target group of the planned project is the residents of Stanin Municipality directly participating in the project. These are the direct users of the infrastructure created by the project. The power of the installed installations will be: solar installations of 1593.4 kW, 1075.1 kW, 336,8 kW units (total installation capacity 1,31397 MW); biomass boilers 1 pcs of 15 kW, 9 units of 20 kW, 2 pcs of 25 kW (total power of 0.245 MW boilers) (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.04.01.00-06-0170/16
    0 references