Construction of the sewerage network together with the modernisation of the wastewater treatment plant in the agglomeration of Piotrowice and the modernisation of the water catchment area in Strzyżeach and Beeswax Willi (Q105638)

From EU Knowledge Graph
Revision as of 22:48, 23 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the sewerage network together with the modernisation of the wastewater treatment plant in the agglomeration of Piotrowice and the modernisation of the water catchment area in Strzyżeach and Beeswax Willi
Project in Poland financed by DG Regio

    Statements

    0 references
    2,810,637.82 zloty
    0 references
    674,553.08 Euro
    13 January 2020
    0 references
    4,408,843.64 zloty
    0 references
    1,058,122.47 Euro
    13 January 2020
    0 references
    63.75 percent
    0 references
    23 October 2015
    0 references
    21 December 2018
    0 references
    GMINA STRZYŻEWICE
    0 references
    Celem głównym projektu jest: zwiększenie udziału osób objętych zbiorczym systemem kanalizacji sanitarnej na terenie gminy Strzyżewice. Grupą docelową są odbiorcy usług w zakresie zaopatrzenia w wodę oraz odbioru ścieków z terenu gminy Strzyżewice (w tym m.in. z terenu aglomeracji w zakresie rozbudowy sieci kanalizacji sanitarnej). Liczba osób, które skorzystają z ulepszonego oczyszczania ścieków wyniesie 2517 (w tym nowopodłączonych 717 oraz 1800 osób obecnie podłączonych do sieci kanalizacji sanitarnej). Liczba osób, które skorzystają z ulepszonego zaopatrzenia w wodę wyniesie 6827 osób (osoby obecnie podłączone do sieci wodociągowej). Powyższe rezultaty zostaną osiągnięte w wyniku realizacji zakresu rzeczowego projektu, który obejmuje następujące przedsięwzięcia: 1) Budowa sieci kanalizacyjnej na terenie aglomeracji Piotrowice w Piotrowicach, Bystrzycy Starej i Bystrzycy Nowej 2) Modernizacja oczyszczalni ścieków w Piotrowicach - zakup i montaż prasy taśmowej do odwadniania osadu wraz z linią higienizacji osadu, zakup stacji dmuchaw oraz montaż instalacji fotowoltaicznej do awaryjnego oświetlenia oczyszczalni 3) Modernizacja ujęcia wody w Strzyżewicach - montaż instalacji fotowoltaicznej do awaryjnego oświetlenia obiektu, zakup chloratora, instalacja elektr. autom. systemu kontroli wydobycia, magazyn., uzdatnia. i dystrybucji wody wraz z sygnaliza. GPS o zaistniałych awariach oraz wyznaczenie stref dostępu. Planowana jest wymiana wodomierzy na nowe pozwalające na automatyczne przesyłanie stanów licznika do działu sprzedaży(121 wodomierzy w Bystrzycy Starej i Bystrzycy Nowej na odcinku planowanej sieci kanalizacyjnej) 4)Modernizacja ujęcia wody w Pszczelej Woli - zakup nowej pompy głębinowej. Ponadto w ramach projektu uruchomiony zostanie serwis, za pośrednictwem którego użytkownicy będą mogli dokonywać transakcji on-line (m.in. zawieranie umów, odczyty liczników, pobieranie opłat, zapytania) oraz będzie badany poziom satysfakcji użytkowników z otrzymywanych usług. (Polish)
    0 references
    The main aim of the project is: increasing the share of the population covered by the collective sewerage system in the municipality of Strzyżece. The target group is the target audience for the supply of water and waste water from the municipality of Strzyżece (including, but not limited to, the urban development of the sewage system). The number of people who will benefit from an improved waste water treatment will be 2517 (including new 717 and 1800 now connected to the sanitary sewage system). The number of people who benefit from an improved water supply will be 6827 people (people currently connected to the water system). The above results will be achieved by the realisation of the material scope of the project, which includes the following projects: 1) Construction of a sewage network in Piotrowice in Piotrowice, Bystrzycy Starj and Bystrzycy Nowa 2) Modernisation of wastewater treatment plant in Piotrowice — purchase and installation of a belt press for the dewatering of the sludge with a sludge hygiene line, purchase of dmuchat station and installation of a photovoltaic installation for emergency lighting on the site 3) Modernisation of water treatment in Strzyżowice — installation of a photovoltaic installation for emergency lighting of the plant, purchase of a chloritor, installation of an electroom. system of mining, storage, storage and distribution of water and signalling. GPS of accidents, and designation of access zones. An exchange of water meters is planned to allow the meter to be sent automatically to the sales department (121 meters in the Bystrzycy Starj and Bystrick Nowa in the stretch of planned sewage system) 4) Modernisation of the water intake in Woli Woli — the purchase of a new deep-sea pump. In addition, the project will launch a service through which users will be able to make online transactions (such as concluding contracts, reading meter readings, collecting fees, enquiries) and will examine the level of satisfaction of users from the services they receive. (English)
    0 references

    Identifiers

    RPLU.06.04.00-06-0037/15
    0 references