Modernisation of the automatic water treatment plant in the Lugansk Shipyard. (Q105584)

From EU Knowledge Graph
Revision as of 22:41, 23 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Modernisation of the automatic water treatment plant in the Lugansk Shipyard.
Project in Poland financed by DG Regio

    Statements

    0 references
    348,546.57 zloty
    0 references
    83,651.18 Euro
    13 January 2020
    0 references
    410,054.83 zloty
    0 references
    98,413.16 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    27 April 2018
    0 references
    24 August 2020
    0 references
    MIASTO STOCZEK ŁUKOWSKI
    0 references
    0 references
    Przedmiotem pro jest przebudowa stacji uzdatniania wody w m. Stoczek Łukowski.Zapewnienie dostaw wody o odpowiednich parametrach jest jednym z warunków rozwoju miasta.Kluczowym rezultatem proj jest udostępnienie 2520 mieszkańcom miasta(grupa docelowa proj) ulepszonego zaopatrzenia w wodę spełniającą wymogi wynikające z prawa wspólnotowego oraz z Rozp.Min. Zdrowia.Opisane rezultaty zostaną osiągnięte dzięki przebudowie 1SUW:wymiana pomp przewałowych Q=30 m3/h,montaż układu do korekty pH wody, wymianę przepustnic pneumatycznych, wymianę złóż filtracyjnych w filtrach ciśnieniowych, montaż dmuchawy do płukania filtrów powietrzem Q=1,8 m3/h,wymiana przepływomierza. W ramach inwestycji przygotowano dokumentację: projekt techniczny, studium wykonalności.Przewidziano zadanie dotyczące świadczenia usługi inspektora nadzoru i kampanię dla realizacji zobowiązań związanych z promocją proj oraz koszty związane z zarządzaniem proj. Zakres planowanych zadań w proj.:przebudowa ujęcia wody podziemnej o zdolności poboru do Q=60m3/dobę, zlokalizowanego na działce nr 2115. Real. proj gwarantuje prawidłowe zagospodarowania powstałych nieczystości.Zaplanowane zadania w proj polegają na uruchomieniu serwisów, za pośrednictwem których użytkownicy będą mogli dokonywać transakcji on-line (w tym zawieranie umów, odczyty liczników, pobieranie opłat, stan rozliczeń, uwagi i skargi, zapytania, dostępność dotychczasowych i nowych usług itp.). Dodatkowo zostanie wykorzystany system ICT wspomagający zarz. gospodarką wodno-ściekową (instalacja nowoczesnych wodomierzy z nakładką do odczytu radiowego pozwoli na dokładniejsze i łatwiejsze kontrolowanie zużycia wody- w ramach planowanego projektu nie będzie dokonywany zakup wodomierzy, Wnioskodawca zakupi wodomierze z środków własnych, po zakończeniu realizacji projektu ). (Polish)
    0 references
    The purpose of pro is to rebuild the water treatment plant in m. a water treatment station is to be upgraded. the main result of the objective is to provide 2520 inhabitants of the city (target group) with the provision of an improved water supply to the city (target group) of an improved water supply that meets the requirements of Community law, as well as the combined effects of the conversion of 1SUVs: conversion of the pumping of Q = 30 m³/h, installation of a water pH adjustment system, replacement of pneumatic penetrators, replacement of filter deposits in pressure filters, installation of a filter blower in Q = 1.8 m³/h, flow of a flow meter. Within the framework of the investment, a dossier has been prepared: technical design, feasibility study. the task relating to the provision of the services of the supervisory inspector and the campaign for the implementation of obligations related to promotion and management of Proj are seen. The scope of the planned tasks in proj: reconstruction of the abstraction of groundwater with a capacity to Q = 60 m³/day, located on plot No 2115. In order to ensure sound management, the planned tasks in proj consist of the deployment of services through which users will be able to carry out online transactions (including contracting, reading of meters, collection of fees, situation of settlements, observations and complaints, requests, availability of existing and new services, etc.). In addition, an ICT system will be used to support the water and wastewater management system (installation of modern water meters with a radio reading cap will allow for more accurate and easier control of water use — the planned project will not purchase water meters, the applicant will purchase water from its own resources after completion of the project). (English)
    0 references

    Identifiers

    RPLU.06.04.00-06-0006/18
    0 references