No label defined (Q101771)

From EU Knowledge Graph
Revision as of 15:42, 17 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    2,859,060.0 zloty
    0 references
    686,174.4 Euro
    13 January 2020
    0 references
    3,363,600.0 zloty
    0 references
    807,264.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    16 September 2016
    0 references
    30 September 2019
    0 references
    GMINA CZARNOŻYŁY
    0 references

    51°16'53.4"N, 18°33'48.2"E
    0 references
    ZAŁOŻENIEM PROJEKTU JEST ZWIĘKSZENIE PRODUKCJI ENERGII CIEPLNEJ I ELEKTRYCZNEJ POCHODZĄCEJ Z OZE W BUDYNKACH 247 GOSPODARSTW DOMOWYCH I 2 BUDYNKACH UŻYTECZNOŚCI PUBLICZNEJ NA TERENIE GMINY CZARNOŻYŁY, A TAKŻE UZYSKANIE OSZCZĘDNOŚCI I OPTYMALIZACJI KOSZTÓW ZUŻYCIA TEJ ENERGII. PROJEKT SPEŁNIA WSZYSTKIE CELE PROGRAMOWE I PRZYCZYNIA SIĘ, W SZCZEGÓLNOŚCI DO OBNIŻENIA KOSZTÓW ZUŻYCIA ENERGII W WYNIKU PRODUKCJI ENERGII CIEPLNEJ I ELEKTRYCZNEJ Z OZE W GOSPODARSTWACH DOMOWYCH (BUDOWNICTWO MIESZKANIOWE) I UŻYTECZNOŚCI PUBLICZNEJ, I TYM SAMYM DO REDUKCJI LUB OGRANICZENIA ZUŻYCIA PALIW KONWENCJONALNYCH, A PRZEDE WSZYSTKIM DO ZWIĘKSZENIA UDZIAŁU OZE W BILANSIE PALIWOWO-ENERGETYCZNYM WOJ. ŁÓDZKIEGO. W TYM CELU ZAPLANOWANO INWESTYCJĘ W TRYBIE ZAPROJEKTUJ-WYBUDUJ, POLEGAJĄCĄ NA ZAPROJEKTOWANIU I WYKONANIU INSTALACJI FOTOWOLTAICZNYCH W 2 BUDYNKACH UŻYTECZNOŚCI PUBLICZNEJ, INSTALACJI KOLEKTORÓW SŁONECZNYCH W 247 LOKALIZACJACH, WRAZ Z PRACAMI INFRASTRUKTURALNYMI I MONTAŻOWYMI. NOWE INSTALACJE BĘDĄ PRODUKOWAŁY ENERGIĘ CIEPLNĄ NA POTRZEBY WŁASNE GOSPODARSTW DOMOWYCH NA TERENIE GMINY CZARNOŻYŁY ORAZ ENERGIĘ ELEKTRYCZNĄ NA POTRZEBY WŁASNE BUDYNKÓW UŻYTECZNOŚCI PUBLICZNEJ ZLOKALIZOWANYCH W GMINIE CZARNOŻYŁY. PRODUKCJA ENERGII Z INSTALACJI FOTOWOLTAICZNEJ NIE PRZEWYŻSZY ROCZNEGO ZAPOTRZEBOWANIA NA ENERGIE ELEKTRYCZNĄ W BUDYNKU. W PROJEKCIE WYKORZYSTUJE SIĘ I PROMUJE NAJBARDZIEJ WYDAJNE I PROEKOLOGICZNE TECHNOLOGIE, URZĄDZENIA I INSTALACJE GRZEWCZE. REALIZACJA PROJEKTU PRZYCZYNI SIĘ BEZPOŚREDNIO DO REDUKCJI EMISJI ZANIECZYSZCZEŃ (W TYM CO2) DO POWIETRZA. W PROJEKCIE PRZESTRZEGANE BĘDĄ REGUŁY KONCEPCJI UNIWERSALNEGO PLANOWANIA W ZAKRESIE DOSTĘPNOŚCI, UŻYTECZNOŚCI, ELASTYCZNOŚCI ZASTOSOWANYCH ROZWIĄZAŃ DLA OSÓB NIEPEŁNOSPRAWNYCH. W PROJEKCIE PRZEWIDZIANO OPRACOWANIE STUDIUM WYKONALNOŚCI, PFU I DOKUMENTACJI PROJEKTOWEJ, NADZÓR INWESTORSKI ORAZ PROMOCJĘ PROJEKTU. Z PROJEKTU BEZPOŚREDNIO SKORZYSTAJĄ MIESZKAŃCY 247 GOSPODARSTW DOMOWYCH TJ. 865 MIESZKAŃCÓW GMINY CZARNOŻYŁY. (Polish)
    0 references
    THE AIM OF THE PROJECT IS TO INCREASE THE PRODUCTION OF HEAT AND ELECTRICITY FROM RES IN BUILDINGS OF 247 HOUSEHOLDS AND 2 PUBLIC BUILDINGS IN THE MUNICIPALITY OF CZARNOŻYY, AS WELL AS TO ACHIEVE SAVINGS AND OPTIMISATION OF THE COSTS OF CONSUMPTION OF THIS ENERGY. THE PROJECT MEETS ALL PROGRAMME OBJECTIVES AND CONTRIBUTES IN PARTICULAR TO REDUCING THE COSTS OF ENERGY CONSUMPTION AS A RESULT OF THE PRODUCTION OF HEAT AND ELECTRICITY FROM RES IN HOUSEHOLDS (HOUSING) AND PUBLIC UTILITIES, THEREBY REDUCING OR REDUCING THE CONSUMPTION OF CONVENTIONAL FUELS, AND ABOVE ALL INCREASING THE SHARE OF RES IN THE FUEL AND ENERGY BALANCE OF THE WARS. I'M FROM LODZ. TO THIS END, AN INVESTMENT IN DESIGN-BUILD MODE IS PLANNED, CONSISTING OF DESIGNING AND IMPLEMENTING PHOTOVOLTAIC INSTALLATIONS IN 2 PUBLIC BUILDINGS, SOLAR COLLECTORS INSTALLATIONS IN 247 LOCATIONS, INCLUDING INFRASTRUCTURE AND ASSEMBLY WORKS. NEW INSTALLATIONS WILL PRODUCE HEAT FOR OWN HOUSEHOLDS IN CZARNOŻYY COMMUNE AND ELECTRICITY FOR THEIR OWN PUBLIC BUILDINGS LOCATED IN THE MUNICIPALITY OF CZARNOŻYY. THE PRODUCTION OF ELECTRICITY FROM A PHOTOVOLTAIC INSTALLATION WILL NOT EXCEED THE ANNUAL DEMAND FOR ELECTRICITY IN THE BUILDING. THE PROJECT USES AND PROMOTES THE MOST EFFICIENT AND ENVIRONMENTALLY FRIENDLY TECHNOLOGIES, EQUIPMENT AND HEATING INSTALLATIONS. THE IMPLEMENTATION OF THE PROJECT WILL CONTRIBUTE DIRECTLY TO THE REDUCTION OF POLLUTANT EMISSIONS (INCLUDING CO2) INTO THE AIR. THE PROJECT WILL RESPECT THE PRINCIPLES OF UNIVERSAL PLANNING IN TERMS OF ACCESSIBILITY, USABILITY AND FLEXIBILITY OF THE SOLUTIONS USED FOR PEOPLE WITH DISABILITIES. THE PROJECT INCLUDES THE DEVELOPMENT OF FEASIBILITY STUDIES, PFU AND PROJECT DOCUMENTATION, INVESTOR SUPERVISION AND PROJECT PROMOTION. RESIDENTS OF 247 HOUSEHOLDS, I.E., WILL BENEFIT DIRECTLY FROM THE PROJECT. 865 INHABITANTS OF THE MUNICIPALITY OF CZARNOŻYY. (English)
    17 October 2020
    0 references

    Identifiers

    RPLD.04.01.02-10-0074/16
    0 references