No label defined (Q101715)

From EU Knowledge Graph
Revision as of 15:13, 17 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    8,802,825.4 zloty
    0 references
    2,112,678.10 Euro
    13 January 2020
    0 references
    10,356,265.19 zloty
    0 references
    2,485,503.65 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 December 2014
    0 references
    30 November 2018
    0 references
    GMINA MIASTO TOMASZÓW MAZOWIECKI
    0 references
    0 references

    51°31'10.2"N, 20°2'1.7"E
    0 references
    CEL: POPRAWA DOSTĘPNOŚCI TRANSPORTOWEJ WOJ. ŁÓDZKIEGO, POPRZEZ BUDOWĘ DROGI LOKALNEJ ŁĄCZĄCEJ DROGĘ EKSPRESOWĄ NR 8 STANOWIĄCĄ ELEMENT SIECI TENT, PRZY UWZGLĘDNIENIU ZASAD ZRÓWNOWAŻONEGO ROZWOJU GOSPODARCZEGO I SPOŁECZNEGO. DŁUG. PRZEDM. ODCINKA 2,38 KM. W WYNIKU WDROŻENIA PROJ. NASTĄPI: POPRAWA BEZPIECZEŃSTWA RUCHU KOŁOWEGO I PIESZEGO, POPRAWA POWIĄZAŃ REGIONALNEJ SIECI DRÓG WOJ. ŁÓDZKIEGO Z SIECIĄ DRÓG KRAJOWYCH I TRANSEUROPEJSKĄ SIECIĄ TRANSPORTOWĄ TEN-T, POPRAWA DOSTĘPNOŚCI DO TERENÓW INWESTY., OGRANICZENIE NEGATYWNEGO ODDZIAŁYWANIA INFRASTRUKTURY DROGOWEJ NA STAN I JAKOŚĆ ŚRODOWISKA NATURALNEGO. WDROŻENIE PROJ. ZAPEWNI ZNACZĄCĄ POPRAWĘ WARUNKÓW ŻYCIA NA DANYM TERENIE, ORAZ BĘDZIE POZYTYWNIE ODDZIAŁYWAĆ NA CAŁY REGION W ASPEKCIE: TWORZENIA WARUNKÓW DO ROZWOJU GOSPODARCZEGO., ZWIĘKSZANIA ATRAKCYJNOŚCI INWESTYCYJNEJ WOJ. ŁÓDZKIEGO, OGRANICZANIA DYSPROPORCJI ROZWOJOWYCH. ZADANIA: ZAD. 1 PRZYGOTOWANIE PROJEKTU - DOKUMENTACJA TECHNICZNA., SW. ZAD. 2 ROBOTY BUDOWLANE - BRANŻA DROGOWA – DROGA DOJAZDOWA, OBIEKTY INŻYNIERSKIE (MOST PRZEPUSTY), URZĄDZENIA OCHRONY ŚROD., BEZP. RUCHU, WYCINKA DRZEW, DR. SERWISOWA, (NIEKWALIF. WŁĄCZENIE DROGI W WĘZEŁ S8 - GM. TMAZ., PLAC DO OBSŁUGI TŁOCZNI - GM. M. TMAZ). BRANŻA SANITARNA – KANALIZACJA DESZCZOWA, ZBIORNIK RETENCYJNY, ZABEZPIECZENIE NAD GAZOCIĄGIEM (NIEKWALIF. – KANAL. DESZCZ. NA WŁĄCZENIU W S8 - GM. TMAZ, KANAL. SANITARNA, WODOCIĄG, VAT OD KANAL. DESZCZOWA. - GM. M. TMAZ.) BRANŻA ELEKTROENERGETYCZNA – OŚWIETLENIE ULICZNE, USUNIĘCIE KOLIZJI SIECI 15KV I NN Z DROGĄ (NIEKWALIF. – PRZEBUDOWA LINII 15KV, ZASILANIE TŁOCZNI ŚCIEKÓW, ZASILANIE DO TER. INWEST.OŚWIET. ULICZ.NA WŁĄCZENIU W S8 - GM. TMAZ., ZASILANIE TŁOCZNI - GM. M. TMAZ.) ZAD. 3 ZARZĄDZANIE PROJEKTEM - NADZÓR INWESTORSKI. NADZÓR AUTORSKI. PROMOCJA PROJ. (TABLICE INFORMACYJNE I PROMOCYJNE, OGŁ. W PRASIE LOKALNEJ). GRUPY DOCELOWE: WSZYSCY UŻYTKOWNICY KORZYSTAJĄCY Z WYBUDOWANEJ INFRASTRUKTURY DROGOWEJ: MIESZKAŃCY G I M. TM., POWIATU TOMASZ., TURYŚCI, PRZEDSIĘ (Polish)
    0 references
    OBJECTIVE: IMPROVING TRANSPORT ACCESSIBILITY OF WARS. ŁÓDŹ, THROUGH THE CONSTRUCTION OF A LOCAL ROAD CONNECTING EXPRESSWAY NO. 8, WHICH IS PART OF THE TENT NETWORK, TAKING INTO ACCOUNT THE PRINCIPLES OF SUSTAINABLE ECONOMIC AND SOCIAL DEVELOPMENT. IT’S A DEBT. IT’S THE FRONT. A DISTANCE OF 2.38 KM. AS A RESULT OF THE PROJECT IMPLEMENTATION. THE FOLLOWING WILL BE: IMPROVING THE SAFETY OF ROAD AND PEDESTRIAN TRAFFIC, IMPROVING THE LINKS OF THE REGIONAL ROAD NETWORK. LODZ WITH THE NETWORK OF NATIONAL ROADS AND THE TRANS-EUROPEAN TRANSPORT NETWORK TEN-T, IMPROVING ACCESSIBILITY TO THE AREAS OF INVESTMENT., LIMITING THE NEGATIVE IMPACT OF ROAD INFRASTRUCTURE ON THE STATE AND QUALITY OF THE ENVIRONMENT. IMPLEMENTATION OF THE PROJECT. IT WILL PROVIDE A SIGNIFICANT IMPROVEMENT IN LIVING CONDITIONS IN THE AREA AND WILL HAVE A POSITIVE IMPACT ON THE WHOLE REGION IN TERMS OF: CREATING CONDITIONS FOR ECONOMIC DEVELOPMENT, INCREASING INVESTMENT ATTRACTIVENESS OF THE VOIVODSHIPS. LODZ, LIMITING DEVELOPMENT IMBALANCES. TASKS: IT’S THE ASS. 1 PREPARATION OF THE PROJECT – TECHNICAL DOCUMENTATION., SW. IT’S THE ASS. 2 CONSTRUCTION WORKS – ROAD INDUSTRY – ACCESS ROAD, ENGINEERING FACILITIES (BRIDGE OF CULVERTS), SECURITY EQUIPMENT WEDNESDAY, AMP. TRAFFIC, TREE CUTTING, SERVICE DOCTOR, (NIEKWALIF. INTEGRATION OF THE ROAD INTO THE JUNCTION S8 – GM. TMAZ., GM. M. TMAZ. SANITARY INDUSTRY – RAINWATER DRAINAGE, STORAGE TANK, PROTECTION OVER THE GAS PIPELINE (NOKWALIF. — A SEWER. IT’S RAINING. ON SWITCHING IN S8 – GM. TMAZ, CHANNEL. SANITARY, WATER SUPPLY, VAT ON THE SEWER. IT’S RAINY. — GM.M. TMAZ.) POWER INDUSTRY – STREET LIGHTING, REMOVAL OF COLLISIONS OF 15KV AND NN NETWORKS WITH THE ROAD (NIEKWALIF. — RECONSTRUCTION OF 15KV LINE, POWER SUPPLY OF SEWAGE PRESSING PLANTS, POWER TO TER. IT’S AN INVEST. ULICZ.NA SWITCHED ON IN S8 – GM.TMAZ., POWER SUPPLY OF THE PRESSING PLANT – GM.M. TMAZ. 3 PROJECT MANAGEMENT – INVESTOR SUPERVISION. IT’S COPYRIGHT SUPERVISION. PROMOTION OF THE PROJECT. (INFORMATION AND PROMOTIONAL TABLES, A.K.A. IN THE LOCAL PRESS). TARGET GROUPS: ALL USERS USING BUILT-IN ROAD INFRASTRUCTURE: RESIDENTS OF G AND M. TM., COUNTY TOMASZ., TOURISTS, ENTER (English)
    17 October 2020
    0 references

    Identifiers

    RPLD.03.02.02-10-0016/15
    0 references