Change in the way in which a group of upper secondary school classes can be used in Chełm, ul. The Hallera 23 for the four professions and the replacement of an external lift. (Q98832)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Change in the way in which a group of upper secondary school classes can be used in Chełm, ul. The Hallera 23 for the four professions and the replacement of an external lift. |
Project in Poland financed by DG Regio |
Statements
1,428,035.97 zloty
0 references
1,680,240.0 zloty
0 references
84.99 percent
0 references
17 January 2017
0 references
31 August 2019
0 references
POWIAT TORUŃSKI
0 references
W ramach projektu przeprowadzona zostanie zmiany sposobu użytkowania strychu budynku Zespołu Szkół w Chełmży przy ul. Hallera 23 na cztery pracownie nauki zawodu oraz dobudowa windy zewnętrznej na działce nr 39, obręb 03 Chełmża ul. Hallera 23, 87-140 Chełmża. Inwestycja realizowana będzie w ramach Osi priorytetowej 6. Solidarne społeczeństwo i konkurencyjne kadry, Działania 6.4 Rewitalizacja oraz inwestycje w infrastrukturę edukacyjną w ramach ZIT, Poddziałania 6.4.3 Inwestycje w infrastrukturę kształcenia zawodowego w ramach ZIT, Schemat: Poprawa jakości usług edukacyjnych szkół zawodowych poprzez inwestycje w infrastrukturę i wyposażenie, w ramach Zintegrowanych Inwestycji Terytorialnych (ZIT) w ramach Regionalnego Programu Operacyjnego Województwa Kujawsko-Pomorskiego na lata 2014-2020 (konkurs o dofinansowanie projektów ze środków Europejskiego Funduszu Rozwoju Regionalnego Nr RPKP.06.04.03-IZ.00-04-145/17). (Polish)
0 references
Identifiers
RPKP.06.04.03-04-0004/17
0 references