Implementation of measure 1st part, k. It will be ploughed up (renewal of IP 10, LBK 5b). (Q68728)

From EU Knowledge Graph
Revision as of 23:59, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: budget (P474): 14,763.806 euro)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Implementation of measure 1st part, k. It will be ploughed up (renewal of IP 10, LBK 5b).
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    295,276.12 Czech koruna
    0 references
    11,811.04 Euro
    10 January 2020
    0 references
    369,095.15 Czech koruna
    0 references
    80 percent
    0 references
    1 March 2018
    0 references
    31 August 2022
    0 references
    Obec Zaječí
    0 references
    0 references

    48°52'22.08"N, 16°46'3.22"E
    0 references
    69105
    0 references
    Projektová dokumentace řeší revitalizaci stávající části lokálního biokoridoru LBK 5b a interakčního prvku IP 10 v obci Zaječí. V LBK 5b se nacházejí převážně invazní druhy dřevin a ruderální vegetace. IP 10 tvoří stávající travnatá mez. V LBK 5b dojde k odstranění a zamezení šíření invazních druhů a výsadbě autochtonních druhů listnatých stromů, v IP 10 k výsadbě ovocných stromů starých a stanovištně vhodných odrůd. (Czech)
    0 references
    The project documentation addresses the revitalisation of the current LBK 5b part of the LBK b and the interaction element IP 10 in the municipality. LBK 5b is mainly composed of invasive tree species and hardy vegetation. IP 10 is made up of existing grass limits. In LBK 5b, it will remove and contain the spread of invasive species and planting of native leaf trees, IP 10 for planting of fruit trees of old and habitat types. (English)
    0 references

    Identifiers

    CZ.05.4.27/0.0/0.0/16_029/0002470
    0 references