Construction of tourist infrastructure in the Zachodniopomorskie Province Park in order to reduce anthropogenic pressure — Stage II (Q137968)

From EU Knowledge Graph
Revision as of 14:33, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 1,951,430.7672 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of tourist infrastructure in the Zachodniopomorskie Province Park in order to reduce anthropogenic pressure — Stage II
Project in Poland financed by DG Regio

    Statements

    0 references
    8,130,961.53 zloty
    0 references
    9,565,837.14 zloty
    0 references
    2,295,800.9136 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    27 April 2018
    0 references
    30 April 2019
    0 references
    WOJEWÓDZTWO ZACHODNIOPOMORSKIE
    0 references
    D.1. Krótki opis projektu Przedmiotem projektu będzie montaż i posadowienie małej infrastruktury turystycznej oraz budowa dużej infrastruktury turystycznej na obszarze 6 Parków Krajobrazowych zlokalizowanych na terenie województwa zachodniopomorskiego. Podział zadań w projekcie: 1. Opracowanie niezbędnej dokumentacji i uzyskanie zezwoleń do realizacji niniejszego projektu. 2. Montaż i posadowienie małej infrastruktury (teren 6 Parków), w tym m.in: stopnice, miejsca na ognisko, kierunkowskazy, tablice urzędowe, ławy, stojaki na rowery, stoły, witacze, elementy edukacyjne, kosze na śmieci, tablice edukacyjno-informacyjne, ptasia ekspozycja edukacyjna. 3. Budowa dużej infrastruktury turystycznej (teren 5 Parków): IPK: wieża widokowa z utwardzeniem terenu, pomost pływający z dodatkowym wyposażeniem: drogowskazy montowane poziomo do nawierzchni pomostów, ławki, tablice edukacyjne montowane poziomo do nawierzchni pomostu, ruchome modele edukacyjne, teleskopy do obserwacji życia podwodnego, wiata ogniskowa. DPK: platformy widokowe, wiata ogniskowa, wieża widokowa, kładka na rowie. CPK: 2 wieże widokowe, palisada z bramą. SzPK "PB": pomost, pomost dla kajaków, wiaty ogniskowe, pomost pływający z tarasem pływającym, umocnienie skarp przy wiadukcie i zagospodarowanie dojścia do jeziora, wieża widokowa, rekonstrukcja mostku. B-GPK: wieża widokowa wraz z mała architekturą wokół wierzy: tablice edukacyjne, stojaki na rowery, ławki, ławo-stół, kosze na śmieci i kierunkowskazy. 4. Nadzór i doradztwo nad prawidłowym przebiegiem realizacji projektu. 5. Promocja projektu. Bezpośrednio po zakończeniu montażu i posadowienia małej infrastruktury możliwe będzie wykorzystanie w pełni jej funkcji. Elementy dużej infrastruktury, będą mogły być wykorzystywane po ich wykonaniu oraz uzyskaniu, gdy będzie to konieczne - zezwolenia na użytkowanie. Doświadczenie, wiedza i zadania statutowe ZPKWZ i Partnerów projektu gwarantują prawidłowe uruchomienie i funkcjonowanie powstałej w projekcie inf. (Polish)
    0 references
    D.1. The short description of the project will be the installation and placement of small tourist infrastructure and the construction of a large tourist infrastructure in the 6 Landscape Parks located in the Zachodniopomorskie Province. Project breakdown: 1. To develop the necessary documentation and to be authorised to carry out this project. 2. Installation and placement of small infrastructure (6 Parks area) including, inter alia: staging points, focus areas, direction indicators, official tables, bicycle stands, tables, tables, vitamins, educational elements, waste bins, educational and information boards, and an educational exposure. 3. Construction of a large tourist infrastructure (5 Parków area): IPK: a perception tower with the hardening of a site, a bridge with additional equipment: horizontal guides to the pavement of the bridges, benches, educational boards to be mounted horizontally to the surface of the bridge, mobile educational models, underwater and underwater life telescopes. PK: visibility platforms, shelters, visibility tower, bridge. CPK: 2 sight towers, bites with gates. SzPK “PB”: a bridge, a bridge for kayaks, a bridging point, a bridge with a floating terrace, the strengthening of the turbot at the viaduct and the development of a lake, a tower, the bridge. B-GPK: the tower, together with a small architecture around it, believes: educational tables, bicycle racks, benches, benches, benches, waste bins and direction indicators. 4. Oversight and advice on the correct conduct of the project. 5. Project promotion. It will be possible to make full use of its functions immediately after the installation ends. The elements of the major infrastructure will be able to be used once they have been completed and, where necessary, to be authorised to operate. The experience, knowledge and statutory tasks of the ZPKZ and the Project Partners shall ensure that the design and operation of the project is properly launched and operated. (English)
    0 references

    Identifiers

    RPZP.04.06.00-32-0001/16
    0 references