Construction of a wind power plant (ST1, ST3) in the Strzałkowo municipality with a capacity of 4 MW (2 x 2 MW) with infrastructure and energy connection. (Q134741)

From EU Knowledge Graph
Revision as of 14:08, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 1,511,083.5528 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a wind power plant (ST1, ST3) in the Strzałkowo municipality with a capacity of 4 MW (2 x 2 MW) with infrastructure and energy connection.
Project in Poland financed by DG Regio

    Statements

    0 references
    6,296,181.47 zloty
    0 references
    16,551,476.0 zloty
    0 references
    3,972,354.24 Euro
    13 January 2020
    0 references
    38.04 percent
    0 references
    1 January 2018
    0 references
    31 December 2018
    0 references
    GÓLCZ I SYNOWIE SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    Planowane przedsięwzięcie polega na budowie elektrowni wiatrowej składającej się z dwóch turbin wiatrowych ST1 i ST3 o mocy 2 MW każda (4 MW łącznie) o maksymalnej wysokości do 160 m n.p.t., wraz z elementami towarzyszącymi (linią energetyczną SN, kablami sterowania i niezbędnymi urządzeniami elektroenergetycznymi). Elektrownie wiatrowe zalicza się do źródeł energii odnawialnej. W procesie produkcyjnym nie wykorzystuje się żadnego rodzaju paliw, jedynie energię wiatru. Podstawowymi elementami instalacji są rotor, który przekształca energię wiatru w energię mechaniczną oraz generator prądu umieszczony w gondoli, który zamienia energię mechaniczną w elektryczną. Zamiana energii następuje dzięki zjawisku indukcji elektromagnetycznej. Moc elektrowni jest wypadkową siły wiatru w miejscu jej lokalizacji, oraz konstrukcji elektrowni. Jednym z głównych czynników gospodarki każdego kraju jest bezpieczeństwo energetyczne. Wyrażenie to należy rozumieć jako stan gospodarki umożliwiający pokrycie bieżącego i perspektywicznego zapotrzebowania odbiorców na paliwa i energię w sposób technicznie i ekonomicznie uzasadniony, przy zachowaniu wymagań ochrony środowiska. Budowa naszej elektrowni wspiera takie działanie, a także zwiększa poziom produkcji energii ze źródeł odnawialnych, przez co efektywnie wspiera przejście polskiej gospodarki na niskoemisyjną.Aby ją wybudować niezbędne jest:1. Zakup usług i materiałów budowlanych niezbędnych do budowy dróg dojazdowych i placów montażowych, fundamentów pod wieże do turbin, a także przyłącza energetycznego, linii kablowej SN, uziemienia i kontenerowej stacji pomiarowej.2. Zakup środków trwałych w postaci kompletnych urządzeń elektro-energetycznych niezbędnych do przetwarzania energii wiatrowej na elektryczną - turbin wiatrowych.3. Posiadanie uprawnionego inspektora nadzoru inwestorskiegoEfektami projektu będą:Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE – 2Liczba przedsiębiorstw otrzymujących wsparcie - 1. (Polish)
    0 references
    The planned project consists of the construction of a wind power plant consisting of two wind turbines ST1 and ST3, with a capacity of 2 MW each (4 MW combined), with a maximum height of 160 m., including the accompanying elements (SN line, electric control cables and the necessary power units). Wind power plants are one of renewable energy sources. No fuel, only wind energy, is used in the production process. The basic components of the installation are the rotor that converts wind energy into mechanical energy and a power generator located in the gondoli which converts mechanical energy into electrical power. Energy is converted by electromagnetic induction. The power of the plant is the resultant wind power at the location of the plant and the construction of the power plant. One of the main factors of the economy of each country is energy security. This expression is to be understood as a state of the economy capable of covering current and forward-looking demand for fuel and energy in a technically and economically justified way, while preserving environmental protection requirements. The construction of our power plant supports this and increases the level of production of energy from renewable sources, thereby effectively supporting the transition of the Polish economy into low-carbon. in order to build it, 1 are needed. The purchase of construction services and materials necessary for the construction of access roads and assembly roads, the foundations of the turbines, as well as the power connections, the cable line of the SN, the ground and container station to be measured. 2. Purchase of fixed assets in the form of complete electro-energy devices necessary for the conversion of wind power to wind turbines.3. The number of newly built units generating electricity from RES — 2 Number of enterprises receiving support — 1. (English)
    0 references