Renovation of the Voluntary Fire Brigade buildings in Świerk and Orzeł (Q123888)

From EU Knowledge Graph
Revision as of 11:57, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 104,401.14959999999 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Renovation of the Voluntary Fire Brigade buildings in Świerk and Orzeł
Project in Poland financed by DG Regio

    Statements

    0 references
    435,004.79 zloty
    0 references
    511,770.33 zloty
    0 references
    122,824.88 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    12 December 2018
    0 references
    30 September 2019
    0 references
    GMINA ŚWIERKLANIEC
    0 references

    50°26'21.5"N, 18°56'20.0"E
    0 references
    Przedmiotem projektu jest termomodernizacja dwóch budynków będących własnością Gminy Świerklaniec, w których siedziby mają dwie Ochotnicze Straże Pożarne: OSP Świerklaniec i OSP Orzech. W ramach projektu zostaną wykonane: - zmniejszenie strat przez przenikanie przez ściany zewnętrzne i strop: ocieplenie ścian - metoda bezspoinowa oparta na styropianie jako materiale izolacyjnym, - zmniejszenie strat przez przenikanie przez okna, drzwi i bramy oraz zmniejszenie strat na podgrzanie powietrza wentylacyjnego: wymiana ślusarki i stolarki okiennej i drzwiowej, bramy wjazdowej. - modernizacja c.o. - wymiana kotłów węglowych na kotły gazowe wraz z inst.co i c.w.u. Całość zadania zostanie wykonana w 2018r. i 2019r. Celem projektu jest zwiększenie efektywności energetycznej budynków użyt. publicznej w Gminie Świerklaniec poprzez wykon. kompleksowej termomodernizacji. Po realizacji nastąpi zmn. emisji CO2 o 66,32 t/rok (76,45%) oraz obniżenie zapotrzebowania na ciepło o 551,75 GJ/rok (60,24%). (Polish)
    0 references
    The project is a thermo-modernisation of two buildings owned by the Municipality of Świeruck, where two Voluntary Fire Centres are located: The TSOs Świerliniec and the Ofio TSO. The project will be carried out by: — reduction of losses by absorption through walls and ceilings: insulation of the walls — non-cohesive method based on styroisation as insulation material, — reduction of losses through windows, doors and gates and loss of ventilation losses for ventilation air: replacement of lock and door frames and door frames and gate gates. Modernisation of c.o — replacement of coal boilers with gas boilers for gas boilers with inst.co and hot water boilers. total tasks will be carried out in 2018 and 2019. The aim of the project is to increase the energy efficiency of public buildings in the municipality of Świerk through a comprehensive thermal renovation. Following implementation, there will be a reduction in CO2 emissions of 66,32 tonnes/year (76.45 %) and a reduction in demand for heat of 551,75 GJ/year (60.24 %). (English)