Construction of a nursery for the Public School Group in the Lower Silesia Basin, in conjunction with the modernisation of the existing boiler (Q119234)

From EU Knowledge Graph
Revision as of 11:05, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 178,689.2064 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a nursery for the Public School Group in the Lower Silesia Basin, in conjunction with the modernisation of the existing boiler
Project in Poland financed by DG Regio

    Statements

    0 references
    744,538.36 zloty
    0 references
    1,048,645.6 zloty
    0 references
    251,674.94 Euro
    13 January 2020
    0 references
    71.0 percent
    0 references
    15 August 2016
    0 references
    28 February 2018
    0 references
    GMINA LUBACZÓW
    0 references
    Przedmiotem projektu są działania inwestycyjne mające na celu dobudowę do istniejącego budynku Zespołu Szkół Publicznych w Baszni Dolnej segmentu przedszkola wraz z częściową modernizacją istniejącego budynku w zakresie niezbędnym do połączenia go z przedszkolem, a także modernizację istniejącej kotłowni. Realizacja projektu stworzy korzystne warunki do rozwoju przedszkola w Baszni Dolnej zapewniając jednocześnie podniesienie jakości oraz standardu, a także zwiększenie dostępności do opieki i edukacji najmłodszych dzieci z obszarów wiejskich gminy Lubaczów. Realizacja celu głównego jest możliwa dzięki osiągnięciu celów szczegółowych: -zwiększenie ilości miejsc w Przedszkolu; -umożliwienie dzieciom niepełnosprawnym ruchowo korzystanie z Przedszkola; -poprawa warunków prowadzenia zajęć i pracy w Przedszkolu. W dobudowywanym od podstaw obiekcie zaprojektowano cztery oddziały przedszkolne, sanitariaty, magazynki, brudownik, pomieszczenie higienistki oraz pomieszczenie socjalne. Jednocześnie przewiduje się przebudowę przyłączy wod-kan i elektrycznego. W ramach modernizacji części istniejącej powstanie sala do zajęć ruchowych, rytmicznych i korekcyjnych, także hall. Niezbędne prace w tym zakresie inwestycji obejmują: wyburzenie części ścian działowych i konstrukcyjnych, powiększenie otworu drzwiowego w sali gimnastycznej zamurowanie części otworów okiennych, wymianę: stolarki okiennej i drzwiowej, instalacji sanitarnej, elektrycznej, co. prace wykończeniowe. Łączna powierzchnia użytkowa przedszkola to 510,3 m2. Modernizacja kotłowni obejmuje wymianę pieca na 3 wysokosprawne kotły na paliwo gazowe wraz z nowym systemem spalinowo-powietrznym wyprowadzonym ponad dach szkoły, wymianę instalacji, a także podstawowe prace remontowe w pomieszczenia kotłowni. Przedsięwzięcie planowane jest do realizacji na działce nr ewid. 1120 w Baszni Dolnej. Wskazana działka stanowi własność beneficjenta. (Polish)
    0 references
    The project concerns investment activities aimed at the construction of an existing building unit for the Public School Group in the Lower Silesia Region, with a partial upgrade of the existing building to the extent necessary for it to be connected to the pre-school and to the modernisation of the existing boiler. The implementation of the project will create favourable conditions for the development of a nursery in the Lower Lower House, while at the same time improving the quality and standard and the availability of childcare and education to the youngest children of the rural communities of Lubaczow. The main objective is achieved through the achievement of the specific objectives: An increase in the number of places in Scotland; — enabling children with reduced mobility to make use of the foreschool; Improving the conditions for teaching and working in the field. Four nursery units, toilets, storerooms, dirt room, hygiene room and a social room have been designed in the construction of the facility. At the same time, the reconstruction of water and electric connections is foreseen. As part of the upgrading of the existing part, there will be a room for running, rhythmic and corrective courses, including the hall. The necessary work in this respect includes: demolition of parts of partitions and construction walls, extension of door entrance in the gym with part of window openings, replacement of: frames and doors for window and door frames, for sanitary installations, for electrical installations, and in the finishing works. The total useful floor area of the nursery school is 510.3 m². The modernisation of the boiler includes the replacement of the stove at 3 high efficiency boilers for gaseous fuel, with a new diesel-air system driven over the roof of the school, the replacement of installations, as well as basic renovation works in the boiler room. The project is planned to be carried out on parcel No eard. 1120 in the Lower House of Lower Silesia. The selected parcel is the property of the beneficiary. (English)
    0 references

    Identifiers

    RPPK.06.04.01-18-0034/16
    0 references