“Revitalisation of railway line No 59 along the section border of the State — Chrysanthemums (S)” (Q116738)

From EU Knowledge Graph
Revision as of 05:07, 17 July 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Revitalisation of railway line No 59 along the section border of the State — Chrysanthemums (S)”
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    62,204,811.9 zloty
    0 references
    14,929,154.855999999 Euro
    13 January 2020
    0 references
    73,182,131.65 zloty
    0 references
    17,563,711.6 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    28 June 2018
    0 references
    9 April 2021
    0 references
    PKP POLSKIE LINIE KOLEJOWE SPÓŁKA AKCYJNA
    0 references

    53°1'58.4"N, 23°36'24.1"E
    0 references

    52°50'9.2"N, 23°45'25.2"E
    0 references
    Przedmiotem projektu są prace projektowe oraz rewitalizacja jednotorowej, niezelektryfikowanej, szerokotorowej (1520 mm) linii kolejowej nr 59 na odcinku od km 0,000 do km 20,132 wraz z urządzeniami sterowania ruchem kolejowym, elektroenergetyką, telekomunikacją, skrzyżowaniami w jednym poziomie dróg kołowych i linii kolejowej oraz obiektami inżynieryjnymi. Odcinek Skupowo - Chryzanów w km 20,132 – 27,155 obecnie nie znajduje się w zarzadzaniu PKP PLK S.A. Kategoria linii nr 59– drugorzędna. Całość przedmiotu zamówienia obejmuje wykonanie: 1) Dokumentacji projektowej niezbędnej do prawidłowego wykonania wszystkich robót budowlanych i uzyskania dla niej wszystkich wymaganych opinii, uzgodnień, dopuszczeń, warunków, decyzji i pozwoleń niezbędnych do realizacji przedmiotu zamówienia; 2) Wszystkich robót budowlanych zgodnie z zakresem zamówienia na podstawie opracowanej przez Wykonawcę i zatwierdzonej przez Zamawiającego dokumentacji projektowej, o której mowa w ppkt 1, oraz wszystkich robót przygotowawczych niezbędnych do wykonania zakresu Umowy oraz wszelkich czynności wymaganych Prawem; 3) Przeprowadzenie oceny zgodności każdego podsystemu strukturalnego objętego zakresem zamówienia na każdym etapie (projektowania, budowy i końcowych prób podsystemu). Zamówienie obejmuje zaprojektowanie i wykonanie zakresu torowego, inżynieryjnego i sterowania ruchem kolejowym oraz wszystkich branż niezbędnych do prawidłowego wykonania zadania. Zamawiający zwraca szczególną uwagę, iż całość przedmiotu Zamówienia powinna być wykonana zgodnie z Standardami Technicznymi. (Polish)
    0 references
    The project involves design work and the renovation of one gauge, non-electrified, wide gauge (1 520 mm) of railway line number 59 from km 0,000 to km 20,132 with traffic control units, electric power, telecommunication, road junctions at one road and railway line level and engineering structures. The Skupowo — Chrysanthemums segment in km 20,132-27,155 is currently not in charge of PKP PLK S.A., the category of line 59 — secondary. The whole subject matter of the contract shall be the execution of: 1) the design documentation necessary for the proper performance of all works and obtaining all the required opinions, arrangements, admissions, conditions, decisions and permits necessary for the performance of the contract; (2) all works carried out in accordance with the scope of the contract, on the basis of the documentation drawn up by the Contractor and approved by the Contracting Authority and approved by the Contracting Authority referred to in point 1, and all the necessary preparatory work for the performance of the contract and all the acts required by the Law; 3) Conformity assessment of each structural subsystem covered by the scope of the contract at each stage (design, construction and final testing of the subsystem). The contract shall include the design and execution of the rail, engineering and signalling fields and all sectors necessary for the correct performance of the task. The contracting authority shall pay particular attention to the fact that all of the subject matter of the contract must be carried out in accordance with the technical standards. (English)
    0 references

    Identifiers

    RPPD.04.02.00-20-0003/18
    0 references