Smart energy sources in the municipality of Prince (Q104690)

From EU Knowledge Graph
Revision as of 17:53, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Smart energy sources in the municipality of Prince
Project in Poland financed by DG Regio

    Statements

    0 references
    1,343,077.12 zloty
    0 references
    322,338.5088 Euro
    13 January 2020
    0 references
    1,580,090.73 zloty
    0 references
    379,221.78 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 April 2016
    0 references
    15 December 2018
    0 references
    GMINA KSIĘŻPOL
    0 references
    Q2509836 (Deleted Item)
    0 references
    Celem głównym projektu jest ochrona środowiska naturalnego poprzez zwiększenie wykorzystania energii ze źródeł odnawialnych (OZE). Rezultatem projektu jest "Szacowany roczny spadek emisji gazów cieplarnianych (CI34)" - 182,46 tony ekwiwalentu CO2 / rok. Głównymi grupami docelowymi są mieszkańcy i turyści z terenu gminy (szczegółowy opis znajduje się w studium wykonalności). Projekt przewiduje wykonanie 160 instalacji kolektorów słonecznych (montowanych na budynkach oraz na posesjach). Dodatkowo w projekcie zaplanowano zadania towarzyszące (opracowanie studium wykonalności, opracowanie dokumentacji projektowej i kosztorysu inwestorskiego, wykonanie platformy internetowej zarządzającej energią w oparciu o technologię TIK oraz przeprowadzenie promocji poprzez ustawienie 23 tablic i informacji na stronie www). Analiza wybranego wariantu projektu potwierdza trafność wyboru: - wariant przyczyniający się do realizacji celów projektu - wariant przedstawiający najniższe nakłady na jednostkę miary rezultatu - wariant najszybciej wykonalny z uwagi na najmniej skomplikowany charakter i ograniczenie spraw proceduralnych do minimum - nieskomplikowany charakter wariantu nie wymagania angażowania lub zatrudniania nowych osób - realizacja wariantu nie powoduje konieczności uzyskania dodatkowych pozwoleń - wariant najbardziej akceptowalny przez społeczność lokalną i władze gminy - realizacja wariantu na obszarze strategicznej interwencji (OSI): 4. Obszary gospodarczego wykorzystania walorów przyrodniczych i kulturowych - projekt wpisujący się w cele wszystkich dokumentów strategicznych ( na poziomie ponadregionalnym, regionalnym i lokalnym). W Programie Ochrony Powietrza dla strefy lubelskiej stwierdzone zostały ponadnormat poziomy szkodliwego pyłu zawieszonego w powietrzu (PM10). W skład pyłu zawieszonego mogą wchodzić substancje toksyczne m.in. benzo(a)piren. W związku z powyższym planowana inwest polegająca na zmniejszeniu emisji szkodliwych substancji do środ zgodna jest z POP (Polish)
    0 references
    The aim of the project is to protect the environment by increasing the use of energy from renewable sources (RES). The result of the project is the ‘Estimated annual decrease in greenhouse gas emissions (CI34)’ — 182,46 tonnes CO2/rok equivalent. The main target groups are the inhabitants and tourists of the municipality (detailed description is included in the feasibility study). The project provides for the installation of 160 solar collectors (mounted on buildings and Members). In addition, the project has planned the associated tasks (development of a feasibility study, development of a design documentation and an investment cost estimate, implementation of an online energy management platform based on ICT and promotion through the setting of 23 tables and information on the website). The analysis of the selected project option confirms the appropriateness of the selection: The option contributing to the achievement of the objectives of the project — the option presenting the lowest level of output per unit of result — option feasible as soon as possible, due to the least complex nature and the limitation of procedural matters to a minimum — the uncomplicated nature of the option not to require the involvement or recruitment of new persons — the option to implement the option does not give rise to the need for additional permits — the option that is most acceptable for the local community and the municipality — the implementation of the option in the area of strategic intervention (OSI): 4. Areas of economic use of natural and cultural assets — a project that is part of all strategic documents (at interregional, regional and local level). The air protection programme for the Lublin zone found that the levels of harmful particulate matter (PM10) were harmful in the air. Particulate matter may consist of toxic substances including benzo (a) pyrene. In the light of the above, the planned investment to reduce emissions by harmful substances is in line with the POP. (English)
    0 references

    Identifiers

    RPLU.04.01.00-06-0076/16
    0 references