Thermal modernisation of the polymer building of the Silesian University of Technology located in Gliwice ul. Domestic 7A (Q84494)

From EU Knowledge Graph
Revision as of 06:06, 23 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 89,430.39600000001 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the polymer building of the Silesian University of Technology located in Gliwice ul. Domestic 7A
Project in Poland financed by DG Regio

    Statements

    0 references
    372,626.65 zloty
    0 references
    438,384.3 zloty
    0 references
    105,212.23 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 January 2018
    0 references
    30 November 2020
    0 references
    POLITECHNIKA ŚLĄSKA
    0 references
    0 references
    Zakres geograficzny projektu Projekt zlokalizowany jest w Województwie Śląskim w mieście Gliwice. Dotyczy obiektu znajdującego się przy ul. Strzody 7A Zakres przedmiotowy projektu Przedmiotem projektu jest termomodernizacja budynku w którym zostanie wykonane: - docieplenie ścian 338,30 m2, - docieplenie stropu 136,00 m2, - docieplenie dachów 287,70 m2, - docieplenie ściany w gruncie 132,00 m2, Zakres podmiotowy projektu Beneficjentem jest Politechnika Śląska, będąca uczelnią publiczną. Do zarządzania realizacją przedsięwzięcia wyznaczony zostanie Kierownik Projektu, który będzie również nadzorował rozliczenia. Roboty budowlane będą nadzorowane i koordynowane przez inspektorów nadzoru z Działu Technicznego i Inwestycji. Obiekt jest własnością Politechniki Śląskiej i nie przewiduje się zmian w tym temacie. Projekt nie zostanie poddany tzw. znaczącej modyfikacji, zapewniona zostanie jego trwałość. Większość kosztów prac wchodzących w zakres projektu jest kosztami kwalifikowanymi, które szacowane są na kwotę 460 635,40 zł poi uwzględnieniu luki w finansowaniu wynoszącej 86,40%, natomiast całkowita szacunkowa wartość nakładów wynosi 633 210 zł. Z kosztów kwalifikowanych zostały wyłączone następujące składniki: - podatek VAT, który Uczelnia może odliczyć wg wskaźnika prestruktury, - prace poza termomodernizacją (odwodnienie liniowe i odtworzenie nowych schodów). Stosowane będą wyłącznie materiały posiadające stosowne dopuszczenia, nie przewiduje się wykorzystania starych urządzeń. Po zakończeniu realizacji projektu zostanie przeprowadzony audyt energetyczny ex-post zgodnie z kryteriami dla poddziałania 1.3.1 (Polish)
    0 references
    The geographical scope of the project is located in the region of Silesia in the city of Gliwice.The object is located at ul.7A Coverage of the project is thermo-modernisation of the building where the building will be constructed:— insulation of walls of 338.30 m², — insulation of the roof of 136.00 m² — insulation of the roof of 287.70 m² — insulation of the wall m² — insulation of the wall at 132.00 m², the scope ratione personae of the project is the Silesian University of Technology, which is a public university.The Project Manager will be designated to manage the implementation of the project, who will also supervise the accounts.The construction work will be supervised and coordinated by supervisors in the Technical and Investment Division.The site is owned by the Silesian University of Technology and no changes are foreseen.The project will not be subject to a substantial modification, and its durability will be ensured.Most of the costs of the work falling within the scope of the project are eligible costs, which are estimated at PLN 460 635,40 and account is to be taken of the funding gap of 86.40 %, while the total estimated value of the expenditure is PLN 633 210.The following components are excluded from the eligible costs:— VAT which it may deduct from the prestructure index — works outside thermal modernisation (linear drainage and replacement of new stairs).Only materials with appropriate approvals will be used, no use of old equipment is foreseen.After completion of the project an ex-post energy audit will be carried out in accordance with the criteria for sub-measure 1.3.1. (English)
    0 references

    Identifiers

    POIS.01.03.01-00-0025/17
    0 references