AVAPS development centre (Q9620)

From EU Knowledge Graph
Revision as of 07:21, 2 September 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): AVAPS is engaged in the development and production of fire protection in the construction industry (turns, closures). The aim of the project is to build a new development centre of the company AVAPS, which includes the background for construction and development, but especially the background for indicative tests of fire resistance according to various standards. As part of the project, a new centre building will be built, including complete fac...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
AVAPS development centre
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    11,716,036.29 Czech koruna
    0 references
    468,641.4516 Euro
    10 January 2020
    0 references
    23,432,072.58 Czech koruna
    0 references
    937,282.9032 Euro
    10 January 2020
    0 references
    50 percent
    0 references
    9 June 2017
    0 references
    31 May 2018
    0 references
    4 June 2018
    0 references
    AVAPS s.r.o.
    0 references
    0 references

    50°10'45.05"N, 14°24'32.29"E
    0 references
    25067
    0 references
    Společnost AVAPS se zabývá vývojem a výrobou protipožární ochrany ve stavebnictví (vrata, uzávěry). Cílem projektu je vybudovat nové vývojové centrum firmy AVAPS, jehož součástí je zázemí pro konstrukci a vývoj, ale zejména zázemí pro indikativní zkoušky požární odolnosti dle různých norem. V rámci projektu bude vystavěna nová budova centra včetně kompletního zázemí a technologického vybavení. Výsledkem projektu bude celkové zvýšení dynamiky vývoje firmy a tím I posílení na trhu. (Czech)
    0 references
    AVAPS is engaged in the development and production of fire protection in the construction industry (turns, closures). The aim of the project is to build a new development centre of the company AVAPS, which includes the background for construction and development, but especially the background for indicative tests of fire resistance according to various standards. As part of the project, a new centre building will be built, including complete facilities and technological equipment. The result of the project will be an overall increase in the dynamics of the company’s development and thus strengthening the market. (English)
    0 references

    Identifiers

    CZ.01.1.02/0.0/0.0/15_002/0000283
    0 references