RES investments as an opportunity for the region and local communities — PV Novgorod installation (Q116874)

From EU Knowledge Graph
Revision as of 05:41, 17 July 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
RES investments as an opportunity for the region and local communities — PV Novgorod installation
Project in Poland financed by DG Regio

    Statements

    0 references
    1,244,670.63 zloty
    0 references
    298,720.95119999995 Euro
    13 January 2020
    0 references
    2,107,471.15 zloty
    0 references
    505,793.08 Euro
    13 January 2020
    0 references
    59.06 percent
    0 references
    17 July 2018
    0 references
    17 April 2019
    0 references
    SIGMA-WOLTAIKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    53°8'43.1"N, 22°0'17.3"E
    0 references

    53°13'41.2"N, 21°52'47.3"E
    0 references

    53°34'43.0"N, 23°6'20.9"E
    0 references
    Projekt wpisuje się w cele szczegółowe działania 5.1 Energetyka oparta na odnawialnych źródłach energii, Osi Priorytetowej V. Gospodarka niskoemisyjna RPO WP 2014-2020 i dotyczy budowy nowych jednostek służących do wytwarzania energii elektrycznej wraz z przyłączeniem do sieci, energia na sprzedaż [typ 3 projektu]. W projekcie zakłada się realizację robót związanych z budową nowych jednostek oze (instalacji fotowoltaicznych) oraz wdrożenie innowacji organizacyjnej jako element energetyki obywatelskiej i dodatkowych korzyści dla regionu (mikro klaster energetyczny). Zakres projektu obejmuje: 1/w ramach udzielonego pozwolenia budowę 1 szt. instalacji oze o mocy 0,65 MW wraz z przyłączem elektroenergetycznym 15 kV i ogrodzeniem, a w tym obszarze w szczególności zakładamy wykonanie robót budowlanych polegających na a)montażu urządzeń fotowoltaicznych o mocy 0,65 MW na konstrukcji wsporczej naziemnej, b)budowie ogrodzenia, c)posadowieniu kontenerowej stacji transformatorowej oraz budowę przyłącza kablowego napowietrznego (zakres robót w tym obszarze dot. odcinka od miejsca przyłączenia do stacji trafo – obszar został objęty oddzielnym projektem budowy przyłącza elektroenergetycznego stanowiącego załącznik do dokonanego i przyjętego zgłoszenia robót budowlanych) oraz 2/ roboty niewymagające pozwolenia na budowę ani zgłoszenia związane z montażem 3 dachowych mikroinstalacji fotowoltaicznych o mocy ok. 2,00 kW każda. Moc łączna instalacji w projekcie (0,66 MW). W projekcie konieczne jest poniesienie wydatku inspektora nadzoru jako niezbędnego z pkt widzenia poprawności realizacji inwestycji). Wartość netto projektu 2795800,00 zł (brutto 3438834,00 zł) wydatki kwalifikowane 2107471,15 zł. Wybrane wskaźniki projektu zostały określone we wniosku w sekcji VI. (Polish)
    0 references
    The project is part of the specific objectives of 5.1 Energy based on renewable energy sources, Priority V of the Economy of Low Carbon ROP PP 2014-2020 and concerns the construction of new electricity generating units with grid connection, energy for sale [type 3]. The project involves the provision of works for the construction of new units (photovoltaic) and the implementation of organisational innovation as an element of civic energy and additional benefits for the region (micro energy cluster). The scope of the project includes: 1/w of the authorisation granted to construct 1 MW of an installation with a capacity of 0.65 MW with a power attachment of 15 kV and a fence, and in this area, in particular, we assume the construction works consisting of (a) the installation of photovoltaic equipment of 0.65 MW on the ground support structure, (b) the construction of the fence, (c) the construction of a container transformer station and the construction of a cable connection station (the scope of the works in this area from the location of the connection to the station — the area was covered by a separate project for the construction of an electricity connection as an annex to the agreed declaration of construction works) and 2/roboty not requiring a building permit or notification relating to the installation of 3 rooftop micro-installations for photovoltaic installations. 2.00 kW each. Total installation capacity (0.66 MW). In the project it is necessary to bear the expense of the supervisory inspector as necessary for the correctness of the realisation of the investment). Net project value of PLN 2795800,00 (gross PLN 3438834,00) eligible expenditure PLN 2107471,15. Selected project indicators are set out in the proposal in Section VI. (English)
    0 references

    Identifiers

    RPPD.05.01.00-20-0374/17
    0 references