A BRIDGE BETWEEN DELLENTROTERRA SCHOOLS AND THE FUTURE THROUGH NEW TECHNOLOGIES (Q1868049)
Jump to navigation
Jump to search
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | A BRIDGE BETWEEN DELLENTROTERRA SCHOOLS AND THE FUTURE THROUGH NEW TECHNOLOGIES |
Project in Italy financed by DG Regio |
Statements
18,359.0 Euro
0 references
18,359.0 Euro
0 references
100.0 percent
0 references
28 January 2016
0 references
4 August 2016
0 references
16 November 2016
0 references
I.C. PIEVE DI TECO-PONTEDASSIO
0 references
IL PROGETTO SI PONE LOBIETTIVO DI REALIZZARE UNINFRASTRUTTURA DI RETE LANWLAN PER LA COPERTURA TOTALE DELLIC PIEVE DI TECOPONTEDASSIO COMPRESE LE SEDI ASSOCIATE E DISTACCATE LA COPERTURA DI CONNESSIONE RIGUARDER TUTTI GLI SPAZI DI TUTTI GLI EDIFICI OVE SI SVOLGONO LE ATTIVIT DIDATTICHEEDUCATIVE IN PARTICOLARE SI INTENDE ESTENDERE LA DISTRIBUZIONE DELLA CONNESSIONE NEI PLESSI DI PIEVE DI TECO PONTEDASSIO SCUOLA PRIMARIA PONTEDASSIO SCUOLA SECONDARIA DI PRIMO GRADO BORGOMARO PORNASSIO E RANZO GLI INTERVENTI RIGUARDERANNO SIA LA RETE CABLATA LAN CHE LA RETE WIFI (Italian)
0 references
THE AIM OF THE PROJECT IS TO SET UP LANWLAN NETWORK INFRASTRUCTURE FOR THE TOTAL COVERAGE DELLIX PIEVE DI TECOPONTDASSIO INCLUDING THE ASSOCIATED LOCATIONS AND THE RELATED CONNECTION COVERAGE FOR ALL BUILDINGS IN THE EVENT THAT ALL BUILDINGS ARE LOCATED WHERE THE ACTIVITIES ARE CARRIED OUT DIDATTICHEEEDUCATIVE IN PARTICULAR, THE AIM IS TO EXTEND THE DISTRIBUTION OF THE CONNECTION IN ALL BUILDINGS OF PIEVE OF TECO PONTELDASSIO PRIMARY SCHOOL PONTASSIO SECONDARY SCHOOL BORGOMARO PORNASSIO AND ANZO THE INTERVENTIONS WILL COVER BOTH THE CABLE NETWORK AND THE WIFI NETWORK. (English)
0 references
Identifiers
D76J15000780007
0 references