Construction of the S7 expressway between Gdańsk — Elbląg, and odc. Cost — Elbląg (Q85839)

From EU Knowledge Graph
Revision as of 20:27, 15 July 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the S7 expressway between Gdańsk — Elbląg, and odc. Cost — Elbląg
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    0 references
    0 references
    2,000,550,622.54 zloty
    0 references
    480,132,149.40959996 Euro
    13 January 2020
    0 references
    2,353,588,967.79 zloty
    0 references
    564,861,352.27 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    30 June 2019
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references
    0 references

    54°14'39.1"N, 18°50'44.5"E
    0 references

    54°12'52.6"N, 19°6'54.4"E
    0 references

    54°12'46.8"N, 18°57'8.6"E
    0 references

    54°19'43.3"N, 19°6'47.2"E
    0 references

    54°9'30.2"N, 19°18'31.7"E
    0 references
    Zasadniczą częścią przedsięwzięcia jest budowa drogi ekspresowej S7 na odcinku Koszwały - Elbląg o łącznej długości 39,63 km, która w całości zlokalizowana jest w sieci bazowej TEN-T. Przedmiotowa inwestycja składa się z dwóch zadań projektowych: • Zadanie 1: Koszwały – Nowy Dwór Gdański, • Zadanie 2: Nowy Dwór Gdański - Kazimierzowo. Początek przedmiotowej inwestycji zlokalizowany jest na końcu Obwodnicy Południowej miasta Gdańska w km 17+482,61. Przebieg trasy zaprojektowano częściowo po nowym śladzie (szczegóły przedstawiono w RSW, rozdział 1.3.1.), koniec przedmiotowej inwestycji zlokalizowano w km 57+116,45, za węzłem Elbląg Zachód (obecnie: Kazimierzowo). Projekt będzie realizowany w systemie tradycyjnym. Droga ekspresowa S7 na odcinku Gdańsk – Elbląg stanowi element transeuropejskich sieci transportowych i jest zlokalizowana w bazowym korytarzu paneuropejskim TEN-T (Morze Bałtyckie – Morze Adriatyckie, Gdańsk – Warszawa - Katowice) zgodnie z Rozporządzeniem UE 1315/2013. (Polish)
    0 references
    The main part of the project is the construction of the S7 expressway in the section ‘Cost — Elbląg g’ with a total length of 39.63 km, which is fully located on the TEN-T core network The investment in question consists of two project tasks:• Task 1:Cost — Nowy Dwór Gdansk,• Task 2:Nowy Dwór Gdański — Kazimierz.The beginning of the investment in question is located at the end of the southern city of Gdańsk at km 17 + 482,61.The route is partly designed after a new footprint (details are provided in the PCF, chapter 1.3.1.), the end of the investment in question is located at km 57 + 116,45, behind the Elbląg West hub (now:Kazimierz).The project will be implemented in the traditional system.The expressway S7 in the stretch of Gdańsk — Elbląg is part of the trans-European transport network and is located in the base corridor of the TEN-T (Baltic Sea — Adriatic, Gdańsk — Warszawa — Katowice) corridor in accordance with EU Regulation (EU) No 1315/2013. (English)
    0 references

    Identifiers

    POIS.03.01.00-00-0018/16
    0 references