Construction of S-8 Wyszków — Białystok, odc. Wyszków — border of Mazowieckie/Podlaskie Province (Q85837)

From EU Knowledge Graph
Revision as of 20:26, 15 July 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of S-8 Wyszków — Białystok, odc. Wyszków — border of Mazowieckie/Podlaskie Province
Project in Poland financed by DG Regio

    Statements

    0 references
    662,623,873.55 zloty
    0 references
    159,029,729.65199998 Euro
    13 January 2020
    0 references
    779,557,498.3 zloty
    0 references
    187,093,799.59 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 March 2020
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references
    0 references

    52°56'55.7"N, 21°45'31.3"E
    0 references

    52°36'16.6"N, 21°28'5.9"E
    0 references
    Projekt obejmuje budowę drogi ekspresowej S8 na odcinku Wyszków – granica województwa mazowieckiego/podlaskiego o całkowitej długości 38,50 km. Droga zlokalizowana jest w województwie mazowieckim, w powiatach ostrołęckim i wyszkowskim. Projekt będzie realizowany w systemie tradycyjnym. Przedmiot inwestycji poprowadzony jest w większości po śladzie istniejącej drogi krajowej nr 8 i obejmuje 3 odcinki drogi ekspresowej S8, rozdzielone istniejącą obwodnicą miasta Ostrów Mazowiecka: 1. Odcinek Wyszków – węzeł „Poręba” (z węzłem) od km 516+482,66 do km 529+470,00 o długości 12,987 km (odcinek 1a). 2. Odcinek węzeł „Poręba” (bez węzła) – Ostrów Mazowiecka od km 529+470,00 do km 545+582,04 o długości około 16,112 km (odcinek 1b). 3. Odcinek od obwodnicy Ostrowi Mazowieckiej do granicy województwa mazowieckiego/podlaskiego od km 553+145,50 do km 562+542,07 o długości około 9,397 km (odcinek 2). (Polish)
    0 references
    The project involves the construction of the section of the Wyszków section of the S8 expressway, the border of the Mazowieckie/Podlaskie region with a total length of 38.50 km.The road is located in Mazowieckie Province, in the Ostrołęcki districts and in the districts of Mazowieckie Province.The project will be implemented in the traditional system.The subject of the investment is mostly carried out following the footprint of the existing national road No 8 and includes 3 sections of the S8 express road, separated by the existing ring road of Ostrów Mazowiecka:1.Section Wyszków — Poręba interchange (with interchange) from km 516 + 482,66 to km 529 + 470,00 with a length of 12.987 km (section 1a).2.Section junction “Poręba” (without junction) — Ostrów Mazowiecka from km 529 + 470,00 to km 545 + 582,04 with a length of approximately 16.112 km (section 1b).3.Section from Ostrów Mazowiecka bypass to the border of Mazowieckie/Podlaskie Province from km 553 + 145,50 to km 562 + 542,07, with a length of approximately 9.397 km (section 2). (English)
    0 references

    Identifiers

    POIS.03.01.00-00-0016/16
    0 references