Construction of the sanitary sewage system, together with the waste water treatment plant and diaphragm in the locality of: Bystrica and Voluntary, Municipality of Swidwin (Q137913)

From EU Knowledge Graph
Revision as of 23:56, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the sanitary sewage system, together with the waste water treatment plant and diaphragm in the locality of: Bystrica and Voluntary, Municipality of Swidwin
Project in Poland financed by DG Regio

    Statements

    0 references
    655,815.57 zloty
    0 references
    157,395.73679999998 Euro
    13 January 2020
    0 references
    949,003.75 zloty
    0 references
    227,760.9 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    26 June 2017
    0 references
    31 December 2020
    0 references
    GMINA ŚWIDWIN
    0 references
    Przedmiotem przedsięwzięcia realizowanego przez Gminę Świdwin, jest budowa kanalizacji sanitarnej wraz z dwiema przepompowniami oraz oczyszczalnią ścieków, zapewniających neutralizację ścieków bytowych na terenie miejscowości Bystrzyna i Dobrowola. Okres realizacji projektu: od 26.06.2017r. – 31.12.2019r. W ramach realizacji projektu przewiduje się przeprowadzenie zadania: budowa sieci kanalizacji sanitarnej na terenie miejscowości Bystrzyna i Dobrowola. Zaplanowane działania obejmują: opracowanie studium wykonalności; wykonanie robót montażowo-budowlanych w ramach budowy sieci kanalizacyjnej i działania promocyjne. Wnioskodawca zamierza również skorzystać z usług Inspektora nadzoru robót budowlanych. Przeprowadzone kompleksowo ww. działania przyczynią się do uruchomienia infrastruktury sanitarnej na terenie dotychczas nieskanalizowanych miejscowości, co pozwoli na uporządkowanie gospodarki ściekowej na terenie gminy, poprzez wyeliminowanie gospodarki ściekowej prowadzonej w oparciu o zbiorniki bezodpływowe i zapewnienie bezpiecznego dla środowisko gruntowo-wodnego sposobu odbioru i transportu ścieków do oczyszczalni ścieków. Projekt wpłynie pozytywnie na środowisko naturalne oraz znacząco poprawi jakość życia mieszkańców ww. miejscowości. Realizacja przedsięwzięcia jest konieczna, na terenie objętym projektem brak systemowego rozwiązania gospodarki ściekowej. Skutkuje to poważnym problemem ekologicznym i sanitarnym. Jedynym właścicielem majątku - sieci kanalizacyjnej powstałej w ramach projektu, będzie Gmina Świdwin. Wybudowana infrastruktura zostanie przekazana nieodpłatnie w użytkowanie GZGK Sp. z o. o., który będzie pełnił funkcję Operatora sieci. Projekt ma charakter stacjonarny, nie jest realizowany na obszarach objętych formami ochrony przyrody. Właściwa gospodarka odpadami, prowadzona zgodnie z ustawą o odpadach- Wnioskodawca zakłada wywóz osadów z oczyszczalni ścieków - nie będą magazynowane. (Polish)
    0 references
    The project carried out by the Municipality of Świdwin consists of the construction of a sewage system together with two pumping stations and a waste water treatment plant, ensuring the neutralisation of domestic waste water in the area of Bystrosna and the Voluntary. Duration of the project: from 26.06.2017 — 31.12.2019 The project will carry out a task: construction of the sanitary sewerage network in the area of Bystrosna and Voluntary. The planned activities include: the development of a feasibility study; construction of construction and construction works in the framework of sewerage network construction and promotion activities. The applicant also intends to avail itself of the services of the EDPS for the supervision of works. The comprehensive activities carried out will contribute to the setting up of the sanitary infrastructure in the hitherto unsurveyed towns, which will allow the wastewater management in the municipality to be organised in the municipality, by eliminating the waste water management based on septic tanks and by ensuring that the sewage treatment plant is safe for the environment by means of collecting and transporting waste water to the waste water treatment plant. The project will have a positive impact on the environment and will significantly improve the quality of life of the inhabitants of the municipality. Implementation of the project is necessary, within the area covered by the project, the lack of a systemic water management solution. This results in a serious environmental and health problem. The sole owner of the property — the sewerage network generated by the project — will be the Municipality of Świdwin. The planned infrastructure will be distributed free of charge to the GZK Sp. z o. o. service, which will serve as the network operator. The project is stationary, not implemented in areas of nature conservation. Proper waste management in accordance with the Waste Act — Applicant is expected to export sludge from the sewage treatment plant — will not be stored. (English)
    0 references

    Identifiers

    RPZP.03.06.00-32-D001/18
    0 references