Promoting the use of renewable energy sources by the ZODR Barzkowice by building a photovoltaic installation at Barzkowice. (Q137736)

From EU Knowledge Graph
Revision as of 00:17, 23 June 2020 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Promoting the use of renewable energy sources by the ZODR Barzkowice by building a photovoltaic installation at Barzkowice.
Project in Poland financed by DG Regio

    Statements

    0 references
    149,845.35 zloty
    0 references
    35,962.884 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    14 February 2017
    0 references
    1 February 2019
    0 references
    ZACHODNIOPOMORSKI OŚRODEK DORADZTWA ROLNICZEGO W BARZKOWICACH
    0 references
    0 references
    Projekt ma charakter stacjonarny. Teren przeznaczony pod zabudowę zlokalizowany jest w m. Barzkowice na działce nr 51/2 obręb Barzkowice. Przedmiotem projektu jest budowa instalacji fotowoltaicznej o mocy 38,40kW – 128 ogniwa fotowoltaiczne o mocy 300Wp każde. Przewiduje się budowę instalacji fotowoltaicznej montowanej na wolnostojącej konstrukcji stalowej.Konstrukcja posadowiona będzie na stopach żelbetowych. Energia pozyskana z instalacji będzie przeznaczona na potrzeby funkcjonowania ZODR w Barzkowicach. ETAPY REALIZACJI PROJEKTU: 1). Przygotowanie dokumentacji projektu - opracowanie Studium wykonalności (I kwartał 2017); 2). Prace budowlano - instalacyjne,w tym: przygotowanie terenu pod budowę, konstrukcja wsporcza pod panele, panale fotowoltaiczne, inwertery, kable, zabezpieczenia, akcesoria, montaż instalacji. (III-IV kwartał 2017 r.) 3). Nadzór nad prawidłową realizacją przedsięwzięcia, w tym: usługi Inżyniera Kontraktu (III-IV kwartał 2017 r.) Za realizację projektu odpowiedzialny będzie wyodrębniony przez Wnioskodawcę zespół projektowy. Struktura zespołu zapewni skuteczne wykorzystanie zasobów Ośrodka oraz wsparcie zewnętrznych specjalistów, tak by zagwarantować pełną efektywność i realizację założonych celów. Wnioskodawca jest w pełni gotowy do realizacji inwestycji. Realizacja projektu nie wymaga uzyskania pozwolenia na budowę ani zgłoszenia robót. Okres realizacji projektu: 14.02.2017 do 29.12.2017 r . Rozwiązania techniczne i technologiczne umożliwiają realizację projektu zgodnie z zakładanym harmonogramem. Po realizacji inwestycji infrastruktura będzie gotowa do wykorzystania w pełnej funkcjonalności. ZODR w Barzkowicach posiada niezbędne zasoby techniczne, kadrowe oraz doświadczenie gwarantujące prawidłową realizację projektu. (Polish)
    0 references
    The project is stationary. The area for construction is located in Barzkowice, on plot No 51/2, of Barzkowice. The project consists of the construction of a 38.40 kW photovoltaic power plant with 128Wp each. The installation of a mounted photovoltaic installation on a free-standing steel construction is foreseen. The energy obtained from the installation will be used for the operation of ZODR in Barzkowice. THE PHASES OF THE IMPLEMENTATION OF THE PROJECT: EUR 1). Preparation of the project documentation — Development of a feasibility study (Q2017); EUR 2). Construction — installation works, including: preparation of the site for construction, the structure supports the panels, the photovoltaic units, inverters, cables, safety features, accessories, installation, installation. (III-fourth quarter of 2017) 3). Supervision of the correct implementation of the project, including: the Contract Engineer service (III-fourth quarter of 2017) For the implementation of the project, the project team shall be responsible for the implementation of the project. The team structure will ensure that the Centre’s resources are effectively used and that external expertise is supported in order to guarantee full efficiency and the achievement of the objectives set. The applicant is fully ready for the realisation of the investment. Implementation of the project does not require a building permit or notification of works. Duration of the project: 14.02.2017 until 29.12.2017 The technical and technological solutions enable the project to be carried out in accordance with the planned timetable. Once the investment has been carried out, the infrastructure will be ready to be used in full functionality. ZODR in Barzkkowicach has the necessary technical resources, staff and experience to ensure that the project is properly implemented. (English)