The implementation of solutions using renewable energy sources for the generation of heat needed for the proper functioning of the company for Konsum in Stobnie. (Q137728)

From EU Knowledge Graph
Revision as of 00:16, 23 June 2020 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
The implementation of solutions using renewable energy sources for the generation of heat needed for the proper functioning of the company for Konsum in Stobnie.
Project in Poland financed by DG Regio

    Statements

    0 references
    336,413.0 zloty
    0 references
    80,739.12 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    9 February 2017
    0 references
    20 November 2018
    0 references
    "KONSBUD" PROJEKTOWANIE I REALIZACJA KONSTRUKCJI BUDOWLANYCH PRZEMYSŁAW ŻUROWSKI
    0 references
    0 references
    Projekt ma charakter stacjonarny. Usytuowany będzie w miejsc Stobno, gm Kołbaskowo, pow policki, woj zachodniopom. Przedsięwzięcie polegać będzie na wymianie pieca gazowego, na piec na pellet (biomasa) o mocy instalacji 69 kW. Instalacja przewiduje przetwarzanie odpadów produkc. w postaci zrębów, trocin, zrzyn, klocków ( pellet) w paliwo wykorzystywane do ogrzewania budynku produkcyjno-biurowego Wnioskodawcy. Obecnie wykorzystywanym paliwem do ogrzania budynku jest gaz ziemny wysokometanowy, który zostanie zastąpiony biomasą. ETAPY REALIZACJI PROJEKTU: Działanie 1 Przygotowanie dokumentacji projektu - w ramach działania opracowane zostanie studium wykonalności projektu (I kwartał 2017r.) Działanie 2. Prace montażowo-instalacyjne wraz z dostawą niezbędnych elementów instalacji do spalania biomasy. Działanie zakłada dostosowanie obecnie funkcjonującej kotłowni gazowej do zamontowania instalacji do przetwarzania i spalania biomasy oraz dostawę i montaż pieca do spalania biomasy, rębaka oraz linii do granulacji trocin. W ramach działania zostanie poniesiony wydatek: Wykonanie kompletnej instalacji przygotowania, podawania i spalania biomasy (III-IV kwartał 2017r.) Działanie 3. Usługi dotyczące kosztów zarządzania i nadzoru nad projektem. W ramach projektu niezbędne jest zlecenie usługi zarządzania i nadzoru nad realizacją projektu.(III-IV kwartał 2017r.) Okres realizacji proj: 09.02.2017 do 29.12.2017 r. Rozwiązania techniczne i technologiczne umożliwiają realizację projektu zgodnie z zakładanym harmonogramem. Po realizacji inwestycji infrastruktura będzie gotowa do wykorzystania w pełnej funkcjonalności. Wnioskodawca posiada niezbędne zasoby techniczne, kadrowe oraz doświadczenie gwarantujące prawidłową realizację projektu. (Polish)
    0 references
    The project is stationary. The location will be located at Stobno, Gm Kolbaskowo, Policki, West Berlin. The project will consist of the replacement of a gas furnace into a pipeline furnace (biomass) with a capacity of 69 kW. The installation provides for the processing of waste to be used for heating the Applicant’s production and office buildings. Currently the fuel used to heat the building is the natural gas to be replaced by biomass. THE PHASES OF THE IMPLEMENTATION OF THE PROJECT: Action 1 — Preparation of project documentation — the action will be followed by a feasibility study of the project (Q2017) Action 2. Outfitting and installation works with the delivery of the necessary components of the biomass combustion installation. The measure provides for the adaptation of the current gas-fired boiler to the installation for the processing and combustion of biomass and the delivery and installation of the biomass furnace, the arm and the line to granulation of sawdust. As part of the action, an expense will be incurred: Performance of the complete installation of biomass preparation, administration and combustion (III-quarter 2017), Measure 3. Services relating to the costs of management and supervision of the project. The project requires the commissioning of a management and supervision service for the implementation of the project. (III-fourth quarter of 2017) The proj period: 09.02.2017 by 29.12.2017, technical and technological solutions enable the project to be carried out in accordance with the planned timetable. Once the investment has been carried out, the infrastructure will be ready to be used in full functionality. The applicant has the necessary technical resources, staff and experience to ensure that the project is properly implemented. (English)
    0 references

    Identifiers

    RPZP.02.10.00-32-B014/17
    0 references