REPLENISHMENT OF BUILDINGS AND EQUIPMENT OF THE CULTURAL HOUSE IN THE GOLAPI (Q132738)

From EU Knowledge Graph
Revision as of 22:41, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
REPLENISHMENT OF BUILDINGS AND EQUIPMENT OF THE CULTURAL HOUSE IN THE GOLAPI
Project in Poland financed by DG Regio

    Statements

    0 references
    1,529,680.6 zloty
    0 references
    367,123.344 Euro
    13 January 2020
    0 references
    2,581,247.59 zloty
    0 references
    619,499.4215999999 Euro
    13 January 2020
    0 references
    73.16 percent
    0 references
    19 May 2017
    0 references
    31 December 2018
    0 references
    GMINA GOŁDAP
    0 references
    0 references

    54°18'28.8"N, 22°18'6.8"E
    0 references
    Uzupełnienie zabudowy, modernizacja części istniejącej i doposażenie Domu Kultury w Gołdapi (Gołdap, ul. Krótka 2) Budynek z ok. 1900r., wpisany do rejestru zabytków, od 1993r. pełni funkcję Domu Kultury, tj. ogólnodostępnego organizatora życia kulturalnego Gołdapi Budynek wymaga przebudowy i uzupełnienia wyposażenia w celu dostosowania do: -współczesnych wymogów funkcjonalnych dla ośrodków edukacji kulturalnej, integracji i aktywizacji społeczności lokalnej -warunków Rozporządzenie Ministra Infrastruktury w sprawie warunków technicznym, jakim powinny odpowiadać budynki i ich usytuowanie *Roboty budowlane, m.in: 1) Rozbudowa obiektu (dobudowanie bryły do istniejącej zabudowy- odtworzenie części budynku zniszczonej w czasie II wojny światowej) 2) Modernizacja wnętrz (zmiana układu funkcjon. pomieszczeń) 3) Montaż podnośników ukośnych dla osób niepełnosp. (2 szt.) *Wyposażenie (sprzęt komp., audio-video, systemy inform., meble, itd): 1) studia nagrań i sali prób 2) sali wielofunkcyjnej i sali widowiskowej 3) kina Kultura Skala Proj. optymalna pod względem techn.–technologicznym, ekonom. i środowiskowym Etapy, sposób wdrażania Projektu: 1.Oprac. programu inwestycji, dokumentacji techn. i studium wykonalności 2.Złożenie wniosku, umowa o dofinans. 3.Wybór wykonawców wg PZP– roboty budowlane, nadzór inwestorski, dostawa wyposażenia, promocja 4.Realizacja prac wg harmonogramu rzecz.-finans. 5.Odbiór prac (protokoły) 6.Zakończenie proj. 7.Finans. rozliczenie proj. Proj. zgodny m.in. z: -Ponadlokalnym programem rewitalizacji sieci miast Cittaslow Woj. Warm.-Maz. -SzOOP RPO WiM– cel temat.9 Promowanie wyłączenia społecznego, walka z ubóstwem i wszelką dyskryminacją, priorytet inwest.9b: Wspieranie rewitalizacji fizycznej, gosp. i społecznej (...)”, celem szczegółowym: Lepsza jakość życia społeczności (...); Zakres proj. zg. z typem wspieranych proj., przyjętych wskaźn.: liczba wspartych obiektów infrastr. zlokalizowanych na rewitalizowanych obszarach (Polish)
    0 references
    Replenishment of the building, modernisation of the existing and retrofitting of the House of Culture in Gołdai (Gołdap, ul. Short 2) Building around 1900R, registered in the Register of Historical Monuments, since 1993 has served as the ‘House of Culture’, i.e. the general public organiser of cultural life Gołdapi Building will require the fitting-out and replenishment of equipment for the purposes of: — contemporary functional requirements for cultural education centres, integration and activation of the local community -conditions Regulation of the Minister for Infrastructure on the technical conditions to be met by buildings and their location * Construction works, including: 1) Extension of the facility (replacement of part of the building destroyed during World War II) 2) Modernisation of interior (modification of the functional layout) (3) Installation of diagonal media outlets for persons with disabilities. (2 units) * Equipment (compression equipment, audio, video, inform systems, furniture, etc.): (1) Studies of the recordings and test room 2) in the multifunction room and performing theatre 3), the “culture” of “Technology, economic and environmental stages of the project” means the implementation of the project: 1.Investment programme, technical documentation and feasibility study 2. 3.Selection of contractors according to PZP- construction work, investor supervision, supply of equipment, promotion 4.Implementation of the work in accordance with the schedule for funding. 5.Acceptance of the work (protocols) 6.End of prop. 7.Finance. In accordance with, inter alia: A transnational programme for the regeneration of the city of Cittaslow Woj. Warm.z-Maz — ROP Wireless — Thematic Objective 9 Promoting social exclusion, combating poverty and any discrimination, priority for investment.9b: Supporting physical, business and social regeneration (...)’, specific objective: Improved quality of life of the community (...); Range to be applied to the type of proj supported. number of infrastructure facilities supported in regenerated areas (English)
    0 references

    Identifiers

    RPWM.08.01.00-28-0011/17
    0 references