“Revitalisation of railway line No 405, section border of the province of Slupsk — Ustka”. (Q122350)

From EU Knowledge Graph
Revision as of 20:32, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Revitalisation of railway line No 405, section border of the province of Slupsk — Ustka”.
Project in Poland financed by DG Regio

    Statements

    0 references
    139,809,213.65 zloty
    0 references
    33,554,211.276 Euro
    13 January 2020
    0 references
    202,961,633.45 zloty
    0 references
    48,710,792.028 Euro
    13 January 2020
    0 references
    84.73 percent
    0 references
    28 February 2017
    0 references
    15 December 2020
    0 references
    PKP POLSKIE LINIE KOLEJOWE S.A.
    0 references
    Q2515024 (Deleted Item)
    0 references
    Inwestycja jest jednym z etapów linii kolejowej nr 405 na odcinku granica województwa - Słupsk - Ustka w km 104,515 - 193,474. W ramach projektu wymieniona zostanie nawierzchnia torowa od stacji Miastko do p.o. Ustka Osiedle. Zmodernizowane i przebudowane zostaną przejazdy kolejowe (53 przejazdów), obiekty inżynieryjne (prace rewitalizacyjne na: 4 mostach, 8 wiaduktach,32 przepustach, jednej ścianie oporowej, wybudowane zostanie nowe przejście pod torami na stacji Kępice oraz wyremontowane przejście pod torami na stacji Miastko), perony (rewitalizacja 22 peronów), telekomunikacja,elektroenergetyka, a także urządzenia srk (zabudowa nowych urządzeń stacyjnych srk na stacjach gdzie planowane są mijanki. Na stacji Miastko, Słupsk i Ustka zaplanowano zabudowę nowych zewnętrznych i wewnętrznych urządzeń srk. Do realizacji rewitalizacji linii kolejowej nr 405 planowany jest wykup gruntów . Przewiduje się również wycinkę drzew i krzewów wzdłuż linii kolejowej. (Polish)
    0 references
    The investment is one of the steps of railway line No 405 along the section border of the province — Słupsk — Ustka at the 104,515-193.474 km. In the framework of the project, the road surface will be replaced by the road surface from the station of Miastko to the Osiedle UUstka Osiedle. The modernised and modernised level of level crossings (53 trips), civil engineering works (regeneration work: 4 bridges, 8 viaducts, 32 culverts, one resistance wall, a new transition will be built at Kępice station and a reassembled transition to the tracks at the station Miastko), the platforms (revitalisation of 22 platforms), telecommunications, electricity, and the interlocking(construction of new static command-signalling devices at stations where mijki are intended to be built. The construction of new external and internal traffic control and signalling equipment is planned for the Miastko, Słupsk and Ustka station. Land grabbing is planned for the regeneration of railway line No 405. A cut of trees and bushes along the railway line is also foreseen. (English)
    0 references

    Identifiers

    RPPM.09.02.02-22-0001/16
    0 references