Improving the quality and accessibility of education at general level through the extension and reconstruction of the Pope John Paul II, (Q119334)

From EU Knowledge Graph
Revision as of 21:12, 22 June 2020 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improving the quality and accessibility of education at general level through the extension and reconstruction of the Pope John Paul II,
Project in Poland financed by DG Regio

    Statements

    0 references
    994,193.11 zloty
    0 references
    238,606.34639999998 Euro
    13 January 2020
    0 references
    40.98 percent
    0 references
    24 July 2015
    0 references
    31 March 2017
    0 references
    ZGROMADZENIE PANIEN OFIAROWANIA NAJŚWIĘTSZEJ MARYI PANNY
    0 references
    0 references
    Potrzeba realizacja niniejszego projektu wynika z analizy problemów, z jakimi boryka się jedna z najlepszych w województwie szkół kształcących na poziomie ogólnym – Liceum Ogólnokształcące im. Jana Pawła II – Sióstr Prezentek. Głównymi problemami, które niniejszy projekt stara się rozwiązać, są: • Zbyt mała powierzchnia dydaktyczna • Niski dostęp dzieci i młodzieży do nowoczesnej i dobrze wyposażonej infrastruktury sportowej oraz dydaktycznej (ograniczony dostęp uczniów do nowoczesnej infrastruktury (ICT) , materiałów edukacyjnych, sprzętu) • Brak możliwości realizacji alternatywnych, aktywnych form spędzania czasu wolnego dzieci i młodzieży z możliwością kreowania kompetencji istotnych dla rynku pracy, gospodarki opartej na wiedzy Celem niniejszego projektu jest wzrost dostępności oraz jakości i atrakcyjności oferty edukacyjnej na poziomie ogólnym w mieście Rzeszowie, poprzez rozbudowę istniejącego obiektu Liceum Ogólnokształcącego. Cel ten zostanie zrealizowany poprzez następujący zakres rzeczowy projektu: - - rozbudowę istniejącego obiektu o nowe skrzydło, - dostosowanie obiektu do potrzeb osób niepełnosprawnych – montaż windy, umożliwiającej dotarcie na każdą kondygnację nowej oraz istniejącej części szkoły, - przygotowanie pomieszczenia, stanowiącego przedłużenie istniejącej Sali gimnastycznej, w której będzie sala do ćwiczeń (fitness) + siłownia, - dostawa sprzętu ICT w celu unowocześnienia działalności placówki, - dostawa pomocy dydaktycznych na potrzeby pracowni fizyki. W wyniku projektu powierzchnia użytkowa obiektu zwiększy się o 670,99 m2 a kubatura o 2 689 m3, docelowe parametry odpowiednio: 3 915,03 m2 oraz 12 724 m2. Projekt realizowany jest w partnerstwie z Fundacją Akademia Szczęśliwej Rodziny - udział partnera w projekcie polega na wniesieniu zasobów ludzkich, wiedzy i doświadczenia - posiada charakter niefinansowy. Rezultatem projektu będzie wzrost liczby miejsc w szkole o 10 uczniów, zapewniając miejsca łącznie dla 447 uczniów. (Polish)
    0 references
    The need to implement this project is the result of an analysis of the problems facing one of the best schools in the general level of education at the general level — the John Paul II general teacher — Sióptek. The main problems which this proposal seeks to resolve are: • The existence of a small teaching area• Low access for children and young people to a modern and equipped sport and educational infrastructure (limited access of students to modern infrastructure (ICT), educational materials, equipment)• There is no possibility to pursue alternative, active leisure activities for children and young people, with the possibility of creating competences relevant for the labour market, the knowledge-based economy, the aim of this project is to increase the availability and the quality and attractiveness of an educational offer at a general level in the city of Rzeszów by expanding the existing school of the general education. This will be achieved through the following scope of the project: — — to extend the existing site to a new wing, to adapt the installation to the needs of persons with disabilities — installation of a lift so as to reach every storey of the new school and the existing part of the school, — to prepare the premises, as an extension of the existing gym, in which it will be the fitness room + gym, the supply of ICT equipment for the modernisation of the activity of the establishment, — the supply of teaching aids for the purposes of physics workers. As a result of the design, the plant’s usable surface area will increase by 670.99 m² and the volume volume by 2 689 m³, the target parameters respectively: 3 915.03 m² and 12 724 m². The project is carried out in partnership with a happy family of the Foundation, with the partner’s participation in the project being the transfer of human resources, knowledge and experience — it has a non-financial character. The project will result in an increase in the number of school places with 10 pupils, providing a total of 447 pupils. (English)
    0 references

    Identifiers

    RPPK.06.04.03-18-0076/16
    0 references