Reconstruction of the stadium MKS Tuchovia with the fitting-out of ‘rock’ to form a recreational path (Q114379)

From EU Knowledge Graph
Revision as of 17:44, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the stadium MKS Tuchovia with the fitting-out of ‘rock’ to form a recreational path
Project in Poland financed by DG Regio

    Statements

    0 references
    3,779,761.41 zloty
    0 references
    907,142.7384 Euro
    13 January 2020
    0 references
    6,671,242.37 zloty
    0 references
    1,601,098.1687999999 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    1 December 2015
    0 references
    30 October 2020
    0 references
    GMINA TUCHÓW
    0 references
    0 references
    Przedmiotem projektu jest rewitalizacja terenów dworskich oraz obszaru w rejonie stadionu miejskiego i stworzenie Miejskiego Centrum Rekreacji i Aktywizacji Skałka. W ramach projektu rozbudowany zostanie budynek stanowiący zaplecze terenów rekreacyjnych, powstaną 2 boiska ze sztuczną trawą i do siatkówki plażowej, powstanie 26 miejsc parkingowych, w tym dla osób z niepełnosprawnością, oraz zagospodarowany teren przy obiektach sportowych. Na terenie dawnego parku Rozwadowskich powstanie miejska przestrzeń zieleni o pow. 23 351 m2.Zakres prac obejmuje: roboty rozbiórkowe ogrodzenia, nawierzchnia, wycinka drzew; przebudowę instalacji wodociągu, gazu oraz instalacji elekt. i budowa inst. fotowol.; budowę boiska treningowego oraz do siatkówki plaż.; niwelacja terenu; wykonanie parkingu oraz chodników i dojazdów; wykonanie terenów zielonych posianie trawy, sadzenie drzew; przebudowę i rozbudowę budynku zaplecza; przebudowę i rozbudowę dróg.Na obszarze Skałki zakres prac obejmuje:budowę ścieżki dydaktycznej; przebudowę istniejącego obiektu z suchą fontanną; budowę murów oporowych; budowę drewnianej altany; budowę oświetlenia oraz montaż el. małej architektur.Dodatkowo zaplanowano przebudowę ul. Szpitalnej na dł. ok 140 m oraz ul. Żeromskiego na dł. 120 m., co zwiększy dostępność terenów rekreacyjnych i zapewni bezpieczny dojazd.W efekcie powstanie miejsce do rekreacji i aktywizacji społ. dostępne dla wszystkich mieszkańców, złożone z: infrastruktury sportowej przy stadionie miejskim boisko o nawierzchni trawiastej 64,90 m x 101,50 m, boisko treningowe o nawierzchni z trawy syntetycznej 28,50 x 58 m i pow. 1653 m2, boisko do siatkówki plażowej 22 m x 14 m; budynku zapleczowego o pow. 781,86 m2 złożonego z części szatniowosanitarnej i aktywizacyjnej zasilanego z instalacji fotowoltaicznej, w której odbywać się będą zajęcia rekreacyjne; nowego zagospodarowanego terenu zielonego Parku Skałka o pow. 23 351 m2. (Polish)
    0 references
    The project focuses on the regeneration of railway areas and the area in the area of the municipal stadium and the establishment of the Municipal Centre for Rehabilitation and Activation of the Skałek City Centre. The project will build up a building serving the hinterland of the recreation area, create 2 pitches with an artificial grass and a beach volleyball, create 26 parking spaces, including for people with disabilities, and a developed site in sports facilities. There will be an urban green area in the old fishing park. 23 351 m² The scope of the work includes: demolition works for fencing, pavement, felling of trees; reconstruction of the water supply, gas and electrical installations and building of the foster-building; construction of the training field and to the network of beaches; levelling of the site; parking and commuting; ploughing up green areas, planting trees; reconstruction and extension of the building back; reconstruction and extension of the soccer site in the area of the work obejmuje:budowę teaching path; reconstruction of an existing plant with a dry fountain; the construction of resistance walls; the building of the wooden cage; construction of lighting and installation of a small archur.Additionally planned reconstruction of ul. A hospital of about 140 m and ul. Long term 120 m. this will increase the accessibility of recreational areas and ensure safe access. as a result, a place for recreation and social activation that are accessible to all inhabitants, made up of: sports infrastructure at the stadium municipal ground with grass surface 64.90 m x 101.50 m, ground training field with a synthetic grass surface 28,50 x 58 m i. 1 653 m², pitch to 22 m x 14 m pitch; ignition building with a coating area. 781.86 m² made up of a phytosanitary and activation part, supplied from a photovoltaic installation where recreational activities will take place; a new developed land of the Green Park of Skałek. 23 351 m². (English)
    0 references

    Identifiers

    RPMP.11.01.02-12-0659/17
    0 references