Construction of water and sewerage network in the agglomeration of Urszulin (Q105625)

From EU Knowledge Graph
Revision as of 14:26, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of water and sewerage network in the agglomeration of Urszulin
Project in Poland financed by DG Regio

    Statements

    0 references
    3,285,102.23 zloty
    0 references
    788,424.5351999999 Euro
    13 January 2020
    0 references
    4,799,375.28 zloty
    0 references
    1,151,850.0672 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    26 November 2015
    0 references
    30 June 2020
    0 references
    GMINNY ZAKŁAD USŁUG KOMUNALNYCH W URSZULINIE SP. Z O.O.
    0 references
    0 references
    Głównym celem projektu jest uporządkowanie gospodarki wodno-ściekowej poprzez zwiększenie udziału osób objętych zbiorczym systemem zaopatrzenia w wodę i zbiorczym systemem gospodarowania ściekami. Cel ten nastąpi poprzez realizację inwestycji, a co za tym idzie umożliwienie realizacji zobowiązań akcesyjnych na terenie aglomeracji Urszulin. Celem szczegółowym projektu jest poprawa warunków życia mieszkańców Gminy Urszulin oraz warunków działania przedsiębiorców poprzez działania mające na celu zniesienie utrudnień związanych z brakiem dostępu do wodociągu lub użytkowaniem zbiorników bezodpływowych oraz ograniczenie ryzyka zanieczyszczenia środowiska. Realizacja celu głównego i szczegółowego zapewni poprawę jakości życia mieszkańców oraz wpłynie pozytywnie na ochronę środowiska naturalnego poprzez eliminację niekontrolowanej emisji zanieczyszczeń do gruntów, wód powierzchniowych i gruntowych. Pozwoli to na zmniejszenie ryzyka zamieszczeń środowiska naturalnego oraz prawdopodobieństwa chorób u ludzi i zwierząt. Dodatkowo realizacja projektu pozwoli na rozwiązanie problemów płynących z niedogodności wykorzystywania na cele gospodarki nieczystościami kanalizacyjnymi zbiorników bezodpływowych oraz z utrudnionego dostępu do wody właściwej jakości. Tak skonstruowany cel projektu w największym stopniu odpowiada zidentyfikowanym w ramach przeprowadzonych analiz problemom zarówno głównym jak i szczegółowym. Grupą docelową są mieszkańcy Gminy Urszulin. Liczba dodatkowych osób korzystających z ulepszonego oczyszczania ścieków (CI19). 370 RLM Liczba dodatkowych osób korzystających z ulepszonego zaopatrzenia w wodę (CI18 )108 osób, wybudowanych zostanie 10,38 km sieci kanalizacji sanitarnej w Andrzejowie, Urszulinie, Zabrodziu, oraz 4,0 km sieci wodociągowej Grabniaku, Andrzejowie, Urszulinie. W ramach projektu wykonane zostaną studium wykonalności, dok. Techniczną, zarządzanie i nadzory, promocja i narzędzia ICT wspomagające obsługę klienta oraz, Monitoring sieci kanalizacyjnej. (Polish)
    0 references
    The main objective of the project is to structure the water and wastewater management by increasing the share of the population included in the water and collective waste water management system. This will be achieved through the implementation of the investment and, consequently, the possibility to fulfil the accession obligations in the agglomeration of Urszulin. The specific objective of the project is to improve the living conditions of the inhabitants of the municipality of Urszulin and the conditions of operation of undertakings by means of measures aimed at removing the handicaps of the lack of access to the water supply or use of septic tanks and to reduce the risk of pollution. Implementation of the main and specific objective will ensure the improvement of the quality of life of the inhabitants and contribute to the protection of the environment by eliminating uncontrolled emissions of pollutants into land, surface water and groundwater. This will reduce the risk of environmental damage and the likelihood of diseases in humans and animals. In addition, the implementation of the project will help to address the problems arising from the disadvantages of managing septic tanks and difficult access to quality water for the economy. The project’s aim is to the greatest extent possible to respond to the issues identified in the analysis of both the main and specific problems identified. The target group is the inhabitants of the municipality of Urszlin. The number of additional persons benefiting from an improved waste water treatment (CI19). 370 p.e. The number of additional persons benefiting from an improved water supply (CI18) of 108 persons will be constructed by 10.38 km of the sanitary sewerage network in Andrzej Andrzej, Urszlinie, Zabrohome and 4.0 km of the water mains Graboniku, Andrzej Urszlinie. The project will include a feasibility study, technical, management and surveillance, promotion and ICT tools for customer support and, monitoring the sewerage system. (English)
    0 references

    Identifiers

    RPLU.06.04.00-06-0031/15
    0 references