Increase in the use of renewable energy sources in the region of Lubelskie — delivery and installation of solar collectors and biomass furnaces situated in the territory of the municipality of Batorz — Stage II (Q104677)

From EU Knowledge Graph
Revision as of 17:53, 22 June 2020 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Increase in the use of renewable energy sources in the region of Lubelskie — delivery and installation of solar collectors and biomass furnaces situated in the territory of the municipality of Batorz — Stage II
Project in Poland financed by DG Regio

    Statements

    0 references
    2,263,635.41 zloty
    0 references
    543,272.4984 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 April 2016
    0 references
    28 December 2018
    0 references
    GMINA BATORZ
    0 references
    0 references
    Projekt (P.) zakłada instalację 174 szt. zestaw. kol. słonecznych. (42szt. o mocy 2100W każdy, 75szt. - 3150W i 57szt.-4200W ) posadowionych wyłącznie na dachach lub elewacjach i 49 kotłów na biomasę (17 o mocy 20kW każdy na pellet, 4 po 24kW na pellet, 22 po 22kW na drewno, 6 po 20 kW na owies) w obiekt. prywat. do podgrz. CWU o sum. mocy 1,60MW. P. przewiduje też serwis www (TIK, ICT)., Usługę oprac. SW, Usługę wyk. dokum. tech., Usługę menedżera P., Koszty osobowe, Usługę inspektora nadzoru, Działania promocyjne w ramach P.. Łączna liczba mieszkańców GB korzystających (GRUPA DOCELOWA) z efektów realizacji P. wyniesie ok. 900 w 223 obiektach. GŁÓWNYM CELEM P. jest zwiększenie stosowania OZE na terenie GB. Cele szczegół.: CEL 1: Upowszechn. techno. wytwarzania czystej energii wśród mieszk. poprzez powszechny montaż OZE na terenie gm.; CEL 2: Redukcja zanieczyszcz. powietrza atmosf. poprzez zmniejszenie emisji związków szkodliwych dzięki zwiększ. udziału energii ze źródeł odnawialnych; CEL 3: Zmniejsz. obciążeń finans. społeczn. lokalnej wynikaj. z opłat za energ. dzięki utworz. indywid. instal. wykorzysta. OZE; P. przycz. się do realiz. zarówno celu prioryt. 4 jak i celu główn. RPO WL. P. wpis. się w cele operac. (2.5; 3.6; 4.5) wskaz. w SRWL 2014-2020. REZULTATEM jest: Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych uzyskana poprzez montaż instalacji do podgrz. CWU o sum. mocy 1,60MW (0,564MW-kolektory 1,04MW-piece), Szacowany roczny spadek emisji gazów cieplar. w ilości 480,63tCO2/rok, Produkcja energii cieplnej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE w ilości 1 066,31MWht/rok. Na podstawie PROGRAMU OCHRONY POWIETRZA DLA STREFY LUBELSKIEJ w GB nie stwierdzono przekroczenie choćby 1go poziomu dopuszczalnego lub docelowego w odniesieniu do substancji podlegających ocenie jakości powietrza. Działania przewidziane w P. przyczyniają się do realizacji działań naprawczych mających na celu poprawę stanu jakości powietrza (Polish)
    0 references
    The project (P) assumes that 174 units should be installed. (42 units of 2100W each, 75 kg. 3150W, 57W and 4200W) posited only on rooftops or elevers and 49 biomass boilers (17 with a power of 20 kW each on pellets, 4 after 24 kW to take wood, 22 after 22 kW for wood, 6 at 20 kW/oats) for wood in the wayside. CCU with a total capacity of 1.60 MW. It also provides for a website (ICT, ICT) service, a work service. Sw, Service to doum.tech., Service of the manager P, personnel costs, supervision of the supervisory inspector, promotion measures in the framework of P. The total population of GB users (GRUPA DOCELOV GROUP) will be about the results of the implementation of P. 900 in 223 sites. The main customs of Mr P. is to increase the use of RES in GB. Specific objectives: OBJECTIVE 1: The production of clean energy to the residential sector, through the universal assembly of renewable energy sources in the area; OBJECTIVE 2: Reduction of air pollution by reducing the emission of harmful compounds due to the increased share of energy from renewable sources; OBJECTIVE 3: Installation of charges for energy. RES; It is part of both the priorite objective. 4 on the one hand and the head on the ground. THE ROP (ROP). They are part of the operational objectives. (2.5; 3.6; 4.5) Indicators in SRWL 2014-2020. The result is: Additional renewable generation capacity obtained by the installation of the installation into the sub-installation. CWU 1.60 MW (0.564 MW-collector 1.04 MW-kiln), Estimated annual decrease in greenhouse gas emissions of 480,63tCO2/rok, generation of thermal energy from newly built/new generation capacity of RES installations in quantities of 1 066,31MWt/year. Based on the data protection programme for Lübeck in GB, there was no evidence of an exceedance of at least 1 levels for substances subject to air quality assessment. The actions foreseen in P. contribute to the implementation of corrective actions to improve air quality (English)
    0 references

    Identifiers

    RPLU.04.01.00-06-0057/16
    0 references