Thermal modernisation of the Urban Agenda 2, Miejskie No 3, and No 5 of the Miejskie No (Q100294)

From EU Knowledge Graph
Revision as of 16:54, 22 June 2020 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the Urban Agenda 2, Miejskie No 3, and No 5 of the Miejskie No
Project in Poland financed by DG Regio

    Statements

    0 references
    3,056,330.26 zloty
    0 references
    733,519.2623999999 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    18 September 2015
    0 references
    31 December 2020
    0 references
    GMINA ŻAGAŃ O STATUSIE MIEJSKIM
    0 references
    0 references

    51°36'55.1"N, 15°18'2.9"E
    0 references
    Projekt polega na kompleksowej termomodernizacji budynku PM nr 2, PM nr 3 oraz filii PM nr 5 w Żaganiu. Głównym problemem jest niska efektywność energetyczna budynków, w tym niska izolacyjność cieplna przegród zewn., co przekłada się na brak komfortu cieplnego użytkowników obiektów, emisję substancji szkodliwych do atmosfery oraz wysokie koszty eksploatacji budynków. Najszerszą grupę interesariuszy są mieszkańcy Żagania tj. 26426 osób, ze wzgl. na wpływ projektu na popr. jakości powietrza. Rezultatem długofalowym projektu jest redukcja emisji substancji szkodliwych do atmosfery. Planowane wskaźniki: produktu: -liczba zmodernizowanych energet. budynków-3szt, -dodatkowa zdolność wytw. energii elektr. ze źr. odnawilanych-0,02535MWe -dodatkowa zdolność wytw. energii cieplnej ze źr. odnawialnych-0,205MWt -liczba wybud. jednostek wytw. energii elekt. z OZE-2szt. -liczba wybud. jednostek wytw. energii cieplnej z OZE-3szt, -pow. użytkowa budynków poddanych termomodernizacji-2365,21m2 -udział projektu w odn. do obszaru obj. programem rewitalizacji-0,06371% -liczba podmiotów wykorzystujących technologie informacyjno-komunikacyjne-3szt rezultatu: -szac. roczny spadek emisji gazów ciepl.-318,81,00ton równoważnikaCO2/rok -zmniejszenie rocznego zuż. energii pierwotnej w budynkach publ.-1.209.121,90kWh/rok -produkcja energii elektr. z nowo wybudowanych instalacji wykorzystujących OZE-25,56723MWhe/rok -produkcja energii cieplnej z nowo wybudowanych instalacji wykorzystujących OZE-614,55833MWht/rok -ilość zaoszcz. energii elekt.-45,264MWh/rok -ilość zaoszczę. energii cieplnej-4022,73GJ/rok -zmniejszenie zużycia energii końcowej w w-ku realizacji projektu-4185,68GJ/rok -wzrost zatr. we wspieranych podmiotach-0,5EPC (mężczyźni) Realiz. projektu obejmuje:oprac. audytów, ekspertyz oritolog., projektów budowl. i kosztorysów, opracowanie SW, przepr. procedury przetargowej na wybór wykonawcy robót oraz realizację inwestycji.Inwestycja będzie nadzorowana przez inspektora (Polish)
    0 references
    The project shall consist of a comprehensive thermal modernisation of the PM2, PM No 3 and branch PM No 5 in Żaging-out. The main problem is the poor energy efficiency of buildings, including low thermal insulation of the building envelope, resulting in a lack of thermal comfort of the occupants of the buildings, the emission of pollutants into the atmosphere and the high cost of operating the buildings. The broadest possible stakeholder group is the residents of the city of Żazania, i.e. 26426 people, as a result of the project’s impact on air quality. The long-term result of the project is the reduction of emissions of pollutants into the atmosphere. Planned indicators: product — number of modernised energete.The buildings-3st, -additional electric power of the electric power plant, in the form of renewable energy — 0,02535MWt. renewable energy — 0,205MWt — number of electricity output units. electric power units including ZE-2k. — number of units of heat energy produced from OE-3k, a useful construction of buildings undergoing a thermal modernisation project — 2 365.21 m² — project participation in renovation; up to an area of renovation of -0.06371 % -number of actors using information and communication technologies — 3 result: Estimated annual fall in gaseous emissions of 1 209 121,90 tonnes to 318,81,00 tonnes/year for electricity generation from newly built installations using OE-25,56723MWhe/year -generation of electricity from newly built installations using OF-614,55833MWhe/year -quantity of saved electricity. electricity generation 45.264 MWh/year -quantity of saved electricity. 4022,73GJ/year -Reduction of final energy consumption in a project to implement -4185,68GJ/year -increase in GJ/year growth-friendliness of the publicly supported bodies-0,5FTE (men) Realised project obejmuje:oprac. audit procedures for the selection of the contractor for the works and implementation of the investment. the investment will be supervised by the inspector. (English)
    0 references

    Identifiers

    RPLB.03.02.01-08-0006/18
    0 references