“The construction of a heating system of the building and the preparation of hot water water by means of a heat pump using geothermal energy of the ground and supporting the installation of solar panels at the Social Assistance House in Brno and the construction of a photovoltaic installation with a heating of Building No 56 called Krasowiec. Thermal modernisation of Building No 60 in th - Q98359 (Q98359)

From EU Knowledge Graph
Revision as of 08:02, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
“The construction of a heating system of the building and the preparation of hot water water by means of a heat pump using geothermal energy of the ground and supporting the installation of solar panels at the Social Assistance House in Brno and the construction of a photovoltaic installation with a heating of Building No 56 called Krasowiec. Thermal modernisation of Building No 60 in th - Q98359
Project in Poland financed by DG Regio

    Statements

    0 references
    1,265,444.0 zloty
    0 references
    303,706.56 Euro
    13 January 2020
    0 references
    2,705,267.5 zloty
    0 references
    649,264.2 Euro
    13 January 2020
    0 references
    47.16 percent
    0 references
    10 March 2014
    0 references
    30 September 2018
    0 references
    POWIAT TORUŃSKI
    0 references
    0 references
    Inwestycja pn. „Przebudowa systemu ogrzewania budynku i przygotowania ciepłej wody użytkowej poprzez zastosowanie pompy ciepła wykorzystującej energię geotermalną ziemi oraz wspomagającej instalacji paneli słonecznych w Domu Pomocy Społecznej w Browinie oraz budowa instalacji fotowoltaicznej wraz z dociepleniem budynku nr 56 tzw. Tarasowca. Termomodernizacja budynku nr 60 w Domu Pomocy Społecznej w Browinie.”Przedmiotem przedsięwzięcia jest termomodernizacja 2 budynków w Domu Pomocy Społecznej w Browinie.Budynek nr 56 Tarasowiec:1. Roboty geologiczne (zamontowanie pomp ciepła wykorzystujących energię geotermalną ziemi)2. Roboty elektryczne ( przyłącze kablowe)3. Technologia kotłowni, roboty budowlane i sanitarne (w tym przebudowa schodów zewnętrznych do kotłowni, wykonanie nowej posadzki wykonanie wentylacji grawitacyjnej, wymiana stolarki okiennej i drzwiowej)4. Urządzenie terenów zielonych ( po odwiertach geotermalnych- powrót do stanu przed inwestycją)5. Roboty elektryczne wewnętrzne ( w związku z montażem instalacji OZE należy wykonać roboty elektryczne wewnętrzne) oraz przyłącze kablowe.6. Instalacja fotowoltaiczna (montaż paneli fotowoltaicznych)7. Docieplenie budynku (m.in. docieplenie ścian zewnętrznych oraz stropodachu maszynowni windy osobowej)8. Konstrukcje wsporcze do paneli fotowoltaicznych9. Oprawy ledowe- (wymiana oświetlenia w budynku na oświetlenie energooszczędne) Razem wartość robót bud. 56 - 1 902 525,80 zł bruttoBudynek nr 601. Roboty termomodernizacyjne -Docieplenie budynku (ocieplenie ścian zewnętrznych, dachu, wymiana okien i drzwi, wymiana oświetlenia na oświetlenie energooszczędne Led, montaż paneli fotowoltaicznych) 2. Modernizacja instalacji c.o. (Przebudowa systemu ogrzewania c.o. z kotłownią wyposażoną w pompę ciepła powietrze/woda Razem wartość robót bud. 60 - 566 263,91 zł brutto (Polish)
    0 references
    The investment: “The construction of a heating system of the building and the preparation of hot water water by means of a heat pump using geothermal energy of the ground and supporting the installation of solar panels at the Social Assistance House in Brno and the construction of a photovoltaic installation with a heating of Building No 56 called Krasowiec. Thermal modernisation of Building No 60 in the Social Assistance House in Brdo.” Geological work (installation of heat pumps using geothermal energy) 2. Electrical Works (cable connection) 3. Boiler technology, construction and sanitary works (including upgrading the staircase to boiler room, construction of a new floor for gravity ventilation, replacement of window and door frames) 4. Installation of green areas (after geothermal drilling — return to state before the investment) 5. Internal electrical work (in connection with the installation of RES installations, internal electrical works must be carried out) and connected cable connection (6). Photovoltaic installation (installation of photovoltaic panels) 7. Insulation of the building (including the insulation of external walls and the steep lift engine room) 8. Photovoltaic units for solar panels (9). Total value of the works (replacement of lighting in the building for energy efficient lighting). 56-1 902 525,80 PLN 601- brutality. Thermal modernisation works — insulation of the building (insulation of external walls, roof, replacement of windows and doors, replacement of lighting on energy efficient end lighting, installation of solar panels) 2. Modernisation of the heating system (Upgrading of the heating system with a boiler equipped with an air/water heat pump, together with the total value of the budget. PLN 60-566 263,91 gross (English)
    0 references